Most trusted source for Tendering Opportunities and Business Intelligence since 2002
Country - Spain
Summary - Execution Of The Works For A Biomass Network Located In Sant Joan De Vilatorrada, To Feed The Facilities Of The Joncadella School And The Collbaix School. The Work Is Formed By: - A Heat Network That Will Allow The Generation Of Heating And Acs Of The Facilities Exposed And Have A Source Of Generation Of Renewable Thermal Energy For All Of Them. - A Biomass Boiler Installation That Will Have An Automatic Power Supply System To Transport The Fuel From The Silo To The Boiler. The Fuel To Be Used Will Be Forest Splinner, Preferably Proximity To Ensure The Minimization Of The Carbon Footprint Produced In Its Transport. The Boiler Will Have The Elements Of The Most Developed Technologies In The Biomass Boiler Sector, And Will Follow The Strictest Rules On Emissions In Order To Guarantee The Least Impact On The Environment. The Actions Include The `` Executive Project Of A Heat Network With Biomass In Sant Joan De Vilatorrada, Drafted By The Technician Carlos Carrillo Romero, Industrial Technical Engineer Of The Engineering Area Grup Serveis Technicals, S.L., Initially Approved By Agreement Of The Plenum Of The Corporation Dated May 30, 2024, Without Allegations In The Public Exhibition Period.
Deadline - Jun 12, 2025
GT reference number - 109778913
Product classification - Boiler installation work
Address - Spain
Contact details - 565656565
Tender notice no. - 76454545
GT Ref Id - 109778913
Document Type - Tender Notices
Description - Description: Execution of the works for a biomass network located in Sant Joan de Vilatorrada, to feed the facilities of the Joncadella School and the Collbaix School. The work is formed by: - A heat network that will allow the generation of he ating and ACS of the facilities exposed and have a source of generation of renewable thermal energy for all of them. - A biomass boiler installation that will have an automatic power supply system to transport the fuel from the silo to the boiler. The fuel to be used will be forest splinner, preferably proximity to ensure the minimization of the carbon footprint produced in its transport. The boiler will have the elements of the most developed te
Gt Ref Id - 109778913
Deadline - Jun 12, 2025
Similar Tenders :
Summary:
|
Why Us
3,00,000 +
Users
190 +
Countries Covered
5,00,000 +
Agencies Tracked
50,000 +
Notices Daily
90 Million +
Database