Toggle Offcanvas
...
Global Government Tenders

Most trusted source for Tendering Opportunities and Business Intelligence since 2002

Design And Construction Of The Hvac At Medupi Power Plant, The Overland Coal Conveyor (Occ) Storm Water Drainage Shall Route Along The Occ Terrace Between The Ten Thousand Ton Silo And Road G20 Located At The Coal Stockyard (Csy) And Cater For A 1:50 Year Flood. The Key Function Of The Concrete Lined Drainage Channel Is For The Erosion Protection Of The Drain.

LPPS0020GCD South Africa has Released a tender for Design And Construction Of The Hvac At Medupi Power Plant, The Overland Coal Conveyor (Occ) Storm Water Drainage Shall Route Along The Occ Terrace Between The Ten Thousand Ton Silo And Road G20 Located At The Coal Stockyard (Csy) And Cater For A 1:50 Year Flood. The Key Function Of The Concrete Lined Drainage Channel Is For The Erosion Protection Of The Drain. in Machinery and Equipments. The tender was released on Feb 15, 2023.

Country - South Africa

Summary - Design And Construction Of The Hvac At Medupi Power Plant, The Overland Coal Conveyor (Occ) Storm Water Drainage Shall Route Along The Occ Terrace Between The Ten Thousand Ton Silo And Road G20 Located At The Coal Stockyard (Csy) And Cater For A 1:50 Year Flood. The Key Function Of The Concrete Lined Drainage Channel Is For The Erosion Protection Of The Drain.

Deadline - login to view

GT reference number - 61821997

Product classification - Conveyors

Organization Details:

  Address - South Africa

  Contact details - 565656565

  Tender notice no. - 76454545

  GT Ref Id - 61821997

  Document Type - Tender Notices

Notice Details and Documents:

Description - LPPS0020GCD has invited a tender Title: Design And Construction Of The Hvac At Medupi Power Plant, The Overland Coal Conveyor (Occ) Storm Water Drainage Shall Route Along The Occ Terrace Between The Ten Thousand Ton Silo And Road G20 Located At The C oal Stockyard (Csy) And Cater For A 1:50 Year Flood. The Key Function Of The Concrete Lined Drainage Channel Is For The Erosion Protection Of The Drain.Notice summary english: Design And Construction Of The Hvac At Medupi Power Plant, The Overland Coal Conveyor (Occ) Storm Water Drainage Shall Route Along The Occ Terrace Between The Ten Thousand Ton Silo And Road G20 Located At The Coal Stockyard (Csy) And Cater For A 1:50 Year Flood. The Key Fun

Gt Ref Id - 61821997

Deadline - Apr 12, 2023

Share share

Similar Tenders :

Create Account

Why Us

3,00,000 +

Users

190 +

Countries Covered

5,00,000 +

Agencies Tracked

50,000 +

Notices Daily

90 Million +

Database