Medical Video Storage System And Related Maintenance (Two Years) Acquisition
Mobile Type C Blood Camera X-Ray Maintenance To Replace Major High-Pressure Circuit Control Panels
B (With Installation And Subsequent Maintenance) With No Contact With Cool Water Temperature Equipment
Huxey'S Going To Switch Jobs At The Oil-Cleaning Station.
Regular Maintenance Of The Plant Communications System In 115-1116 Years
Road Repair Work In The Factory Area, 115 Years
In Xinjiang County, The 115-Year Old-Age Welfare Facility For Disadvantaged Elderly Persons Promoted A Care Programme.
Inspections For The 115Th Year Of The Labour And Security Inspection
The Eps 114 And 115 Air-Pressure Maintenance Contracts.
Peach Factory 69/13.8 Kv Power Transformer (Including Switching, Testing And Educational Training, Etc.)
Community Daytime Service Program For Physically And Mentally Handicapped Persons
Temperature Testing Of Marine Drainage Outside The Southern Power Plant, 115 - 116
Construction Of The Guangtzu/Pontiya Station Surveillance System
In The Early 114-Year-Old Sunrise Building In Long Island, The Old Toilet Rehabilitation Committee Commissioned The Design Of A Surveillance Service.
Water Pump And Associated Equipment (Including Dismantling, Installing, Testing And Training)
One Set (Including Demolition, Installation, Testing And Training) Of The Boilers, Soft Water Systems And Associated Attachments At The Factory.
The Third Nuclear Power Plant, High Pressure Water Heater Shell Control And Repair.
C-750 Reciprocal Natural Gas Compressor 115 Maintenance
T603 Tank Cleaning And Oil Slurry Reduction, Peach Factory South Campus, 115
The Central Plant Ice Water Host Energy Management System Ems Installation