In 115, An E.R.E.'S Tire Maintenance Contract Was Opened.
W2A250006176 Tire Cracking Oil
Clinker October 25Th Plan_Outline Maintenance Of The Control Panel Of The Second-Line Grate Chiller Hydraulic Station And Tire Crushing Grab Inverter
Waste Spinning (Crumbled Material)
A Batch Of Rubber Gloves And Shoes In '14.
Refurbishment Of Earth Excavators, Tire Excavators.
U.S. And U.S. Purchasing Unit 115, Tires And Tire Damage Maintenance Service (Open Contract)
Purchase Of Expendable Equipment, Rubber Mats, Etc., 11 Items.
6 Items And 6 Repair Cases Including Tire Pressure Filling Assembly
Waste Tires And Other 5 Types Of Resource Recycling Cases