Ta-10193 Sri: Artificial Intelligence-Powered Microgrids To Enable A Futuristic And Reliable Distributed Renewable Energy System - Intl. Renewable Energy Specialist (57003-001)
Provision for Power System Strengthening and Renewable Energy Integration Project: Package 5B - Procurement of Grid-Scale Battery Energy Storage System (BESS) of 100MW/100MWh at Kolonnawa Grid Substation on a Turnkey Basis
Provision for Power System Strengthening and Renewable Energy Integration Project: Package 5A - Augmentation of Kolonnawa Grid Substation for the GridScale Battery Energy Storage System (BESS) of 100 MW / 100 MWh on a Turnkey Basis
Supply, Installation And Maintenance Of 200 Kwp Solar System To National Building Research Organization
Provision of Augmentation of Nadukuda Grid Substation to Interconnect Mannar Wind Power Project (Phase 1 – 50 MW)
Consulting Firm For Floating Solar Project
Ta-10105 Sri: Promoting Private Sector Investment In Energy Transition - Consulting Firm For Floating Solar Project (56246-001)
SUPPLY, DELIVERY, INSTALLATION, COMMISSIONING, TESTING, MAINTAINING & TRAINING OF COMPLETE BATTERY TESTING SYSTEM FOR EVALUATING RBESS [RECHARGEABLE BATTERY ENERGY STORAGE SYSTEMS
PROCUREMENT OF EQUIPMENT FOR SUPPLYING, INSTALLATION & COMMISSIONING OF 150kWp SOLAR PV SYSTEM FOR NATIONAL BUILDING RESEARCH ORGANIZATION
Provision for Glass Anti-shatter / Solar Control Film