Technical Assistance To The Cabb Laboratory Subdirectorate For Carrying Out Sampling And Analytical Determinations Of Wastewater Treatment Plants
Announcement from the Motor Roqueta Goteig Irrigation Community (under construction) regarding the public exhibition of Draft Ordinances and Regulations to interested parties.
Work Of The Updated Project Of The Galindo Storm Tank Section Of The Galindo-Beurko Wastewater Treatment Plant.
Consultancy and assistance for the control of the execution works of the Algeciras - Zaragoza railway highway: -Line 400 protection and drainage of the slopes of the Andújar tunnel -Treatment of the Arroyo Arjonilla bridge and stabilization of cut rock -Embankments (PP.KK. 343+100 and 346+970)
Cao2025 Administrative Contract For Arrangement Works Of The Lledó Irrigation Network In The Section Of Carrer Barcelona To The Sports Area And In The Section Of Passeig De Les Estaselles
Technical Assistance For The Drafting And Update Of The Data Sheets Of The Groundwater Bodies Of The Catalonia River Basin District
Ctte1164 Preventive And Corrective Maintenance Service Of The Water Treatment Plants Of The Sant Adrià De Besòs Energy Recovery Plant
Supply Of Drinking Water Generation Machines From Humidity
La Mojonera-Work-Improvement Of The Waterproofing Of The Irrigation Bank
Intelligent management and treatment against legionella in the Baluarte building using URACOOL technology
Framework Agreement For The Contracting Of Services Investigation Of The Quality Of Soil And Groundwater, And Characterization As Waste, With Sustainable Public Procurement Measures
External Prevention Service To Carry Out Complementary Services Of The Specialty Of Occupational Medicine And Health Surveillance, Advice, Support And Training In Occupational Risk Prevention And Other Services In The Public Agency Of Radio And Television Of Andalusia And Its Subsidiary Company Canal Sur Radio Y Televisión S.A.
Execution Of The Works For The Emptying, Consolidation Of Walls And Implementation Of Renewable Contribution Systems Of The Hamlet In The Garaio Park Within The Framework Of The Pstd Beaches And Natural Environment Of The Ullibarri-Gamboa Reservoir Financed By The Recovery, Transformation And Resilience Plan - Financed By The European Union –Nextgenerationeu
Announcement from the Aguatillos and San Sebastián de Aniés Irrigation Community regarding the call for a meeting.
Renewal Of The Drinking Water Distribution Networks On Zumalakarregi Avenue
Connection Work Between Neiker Wastewater Pumping And The New Connection Point At The Arkaute Facilities
In The Municipality Of Baztan, The Project And Faculty Management Of The Construction Of Two Reservoirs To Regulate Water In Arizkun And Ziga And Zigaur In Baztan
Supply Of Drinking Water Generation Machines From Humidity
Execution Of The Works Of The "Addendum To The Project For The Construction Of The Western Sanitation System In Tenerife. Medianías Collectors" And Project Of "Main Sanitation And Stormwater Collectors For The Connection Of The Urban Center Of Chío", Tenerife
Ctte1164 Preventive And Corrective Maintenance Service For The Water Treatment Plants Of The Sant Adrià De Besòs Energy Recovery Plant