Hiring 100% Electric Power Supply From Renewable Energy To The Facilities Of The Tragsa Group Companies Throughout The National Territory
Photovoltaic Supply And Solar Installation For Self -Consumption In Municipal Office Building And Headquartery Of The Eggigure Valley In Sarriguren
Energy Supply And Demanding Concession For The Occupation Of 18 Roofs For The Installation, Management And Maintenance Of Photovoltaic Solar Energy Production Plants.
The Contract Will Be Intended To Execute The Works Of `` 99Kv Photovoltaic Installation On The Roof Of The Municipal Pavilion Of Na Capitana, Of Petra (First Phase), In Accordance With The Project Drafted By The Industrial Technical Engineer, Antoni Aguilà Fuster With No. Of Collegiate 711, In May 2025
Announcement Of The Delegation Of The Government In Castilla Y León, Which Is Convened For The Lifting Of Minutes Prior To The Occupation Of Goods And Rights Affected By The "Churches" Wind Installation, 70.4 Mw And Its Evacuation Infrastructure, In The Municipal Terms Of Churches, Hontanas, Tamarón, Los Balbas, Estar, Rabe Of The Shoes, Late, San Mamés De Burgos And Villal. In The Province Of Burgos.
Resolution Of The Government Delegation In Castilla-La Mancha By Which The Lifting Of Minutes Prior To The Occupation Of Certain Farms Affected By The Construction Of The "Hybrid Gecama Plant Is Convened, With A Photovoltaic Generation Module Of 225 Mw Of Installed Power And A Storage Module By 100 Mw Of Power Batteries", Located In Atalaya De Cañavate Juncosa, In The Province Of Cuenca.
Photovoltaic Supply And Solar Installation For Self -Consumption In Municipal Office Building And Headquartery Of The Eggigure Valley In Sarriguren
Early Processing. Contract Of Photovoltaic Solar Installation Works Of Collective Self -Consumption On The Ceip Cover The Campés For Electric Power Production For Several Municipal Supplies (Included In The Ivace 2025 Aid Program For The Promotion Of Electrical Self -Consumption Facilities For Municipalities Of The C.V.), No. Exp: Iaautc/2025/5.
Hiring Of Works And Supplies For Photovoltaic Solar Installation For Self -Consumption In The Set Of Buildings Of The Palau De Les Corts Valencianes.
Optional Management Service, Without Coordination Of Health And Health, Of The Execution Of The Works Of Photovoltaic Facilities Of Self -Consumption In Several Prisons In The Framework Of The Recovery, Transformation And Resilience Plan - Financed By The European Union - Next Generation Eu
Disposal Of Solar In Apple M 5.0.2 Of Sector 6.1.5. "Viña Rosales"
Drafting Of The Construction Project Of Restitution Of The Environment In The Lock Of The Old Dusol Hydroelectric Power Station On The Brugent River In The Planes D'Hostoles, In The Tm Of Les Planes D'Hostoles
Maintenance Of Photovoltaic Solar Energy Facilities
Public Information Announcement Of The General Directorate Of Energy Related To The Application For Administrative Authorization And Declaration, Specifically, Public Utility Of The Project Corresponding To The Installation Called "Los Lomitos Photovoltaic Solar Plant", In The Municipality Of Granadilla De Abona, Isla De Tenerife. File Er230036.
Resolution Of The Department Of Territory, Housing And Ecological Transition, General Directorate Of Energy, Which Is Granted To Solaria Promotion And Development, Sl, The Modification Of Prior Administrative Authorization And Construction And Declaration Of Public Utility, Of Modification Ii Of The Evacuation Infrastructures Of The Ps Voens Solar 1, Of 49.97 Mwp, Of The Modified Project Ii, Of The Project Of Execution Of The Execution Of The Evacuation Line 220Kv Volans-La Famosa Of Section A, Between Support 25 To Bifurcation A, In The Municipality Of Lleida, In The Segrià Region (Exp. Fue-2024-03922548).
Announcement Of The Miño-Sil Hydrographic Confederation, O.A. Whereby The Granting Of The Concession Is Made Public To Use 2 L/S Of Water From The Comezo River, In The Place Of O Solar, Parish Of San Pedro De Viana (San Pedro), In The Municipality Of Chantada (Lugo) For Livestock Uses. File: A/27/40285.
Supply Of Air Conditioning Equipment For The Work Increased Energy Efficiency, Installation Of Photovoltaic Systems For Self -Consumption And Adaptation Of The Environmental Conditions Of Air Conditioning And Lighting In The General Building Of (Ivia), In Moncada, Within The Frame
Mixed Contract Of Works And Supply Consisting Of The Reform Of The Thermal Production Units (Heating) And New Photovoltaic Installation For The Gandia Grau Sports Center. Next Generationu.
The Purpose That Is Intended To Be Satisfied Through This Contract Is To Have A Construction Project That Design, Describe And Value The Necessary Works To Carry Out The Restitution Of The Environment In The Dam Of The Old Dusol Hydroelectric Power Station On The Brugent River In The Hostoles Plains. The Project Must Analyze The Possible Alternatives Of Total Or Partial Demolition Of The Dam And Project The Chosen Alternative That Will Allow The River Continuity To Be Returned To This Section Of The Brugent River, Included In The Natura 2000 Network.
Maintenance Of Photovoltaic Solar Energy Facilities