Plastic bids and RFP from Spain
View Plastic government contracts and RFPs from Spain. Bid on readily available Plastic tenders from Spain with the best and oldest online tendering platform, since 2002.
Bidding for Plastic tenders in Spain is extremely lucrative for companies of all sizes. Spain tendering authorities release contracts for most of the Plastic products and services procured by them. The most popular categories are -
- Spain plastic tenders
- Spain plastic pipe tenders
- Spain plastic bags tenders
- Spain pvc tenders
- Spain ethylene tenders
- Spain hdpe pipes tenders
- Spain plastic coatings tenders
- Spain plastic packaging tenders
- Spain plastic sheets tenders
- Spain polymers tenders
Global Tenders is the biggest and best website for Spain Plastic tenders and government contracts. The contracts are uploaded from all public and private sources covering over half a million buyers. Sign up to get instant access to unlimited Spain Plastic tenders, advanced search filters, market analysis, industry trends, tender training with 24/7 customer support.
4 Live Notices for Plastic bids and RFP from Spain
Showing 1 to 4
1. The Object Of The Contract Is The Execution Of The Works Defined In The “Project For The Expansion Of The West Sidewalk Of Carrer De Santa Clara De Tàrrega”, Drawn Up By The Municipal Technical Services In May 2026 And Signed By The Engineer Joan Santacana Espasa. 2. The Main Purpose Of The Actions Is The Expansion And Improvement Of The West Sidewalk Of Carrer De Santa Clara, With The Aim Of Guaranteeing Adequate Conditions Of Mobility, Accessibility And Safety For Pedestrians. 3. The Project Foresees, Among Others, The Following Actions: A) Demolition Of The Existing Sidewalk And Curb. B) Expansion Of The Space Intended For Pedestrians. C) Execution Of New Pavements With Gray Flagstone And Cobblestones. D) Execution Of Pavement With Yellow Studs On The Accessible Fords. E) Construction And Adaptation Of Pedestrian Fords. F) Renovation Of The Drinking Water Network By Replacing The Existing 60 Mm Fiber Cement Pipe With A Pe 63 Mm Pn 10 Polyethylene Pipe. G) Renovation Of The Horizontal And Vertical Signage Affected By The Works. H) Installation Of Five Urban Furniture Bins. I) Management Of Waste From Works And Demolitions. J) Execution Of All Those Complementary Actions That Are Necessary For The Complete And Correct Execution Of The Works Defined In The Project. 4. The Contract Includes All The Actions Necessary To Deliver The Work Completely Finished, Functional And Suitable For Use, In Accordance With The Project, Its Annexes, This Specification And The Instructions Of The Optional Management.
Procurement Of Supply Of A Total Of 590 High Density Injected Polyethylene Containers, Newly Manufactured, For Renovation Of The Fleet Of Rear Cargo Containers Of The Añana Square.
Procurement Of Supply Of A Total Of 590 High Density Injected Polyethylene Containers, Newly Manufactured, For Renovation Of The Fleet Of Rear Cargo Containers Of The Añana Square.
The Drinking Water Supply Of The Valldeperes Neighborhood Depends On The Water Coming From The Valldeperes Well Located To The West Of The Center Of The Same Name, About 50 Meters Above Ground Level And At An Elevation Of 660 Masl, The Well Is 1.5 Meters Deep. The Water From The Valldeperes Well Comes From An Aquifer Located With Layers Of Gypsum And Concentrations Of Elements Above The Limits Established By Royal Decree 140/2003 Have Been Detected. From The Valldeperes Well, The Water Is Pumped To The Valldeperes Reservoir, Located To The North Of The Population Center And 690 Meters Above Sea Level. From The Valldeperes Reservoir, Water Is Distributed By Gravity Through A Network Renewed In 2009, Taking Advantage Of Puosc Pavement And Services Works. The Center Of Valldeperes Also Has A Second Source, The Pou Nou Valldeperes, Built In 2020 And Currently Dry. The Pou Nou Valldeperes Is Located To The South-East Of The Town, About 800M Away In Plan And At An Elevation Of 635 Masl. The Pou Nou Valldeperes Has A Connection To The Tank, A Dn50 Pn10 Polyethylene Pipe And A Length Of 1010 Meters, And A Solar Power And Pumping System. This Entire System Could Not Be Put Into Operation Since, Once The Installation Was Completed, It Was Detected That The Well Had Dried Up. Based On The Results Of The Hydrogeological Study Included In Annex 01, It Is Proposed To Build The New Underground Water Catchment At A Point Close To The Nou Pou Valldeperes