The Defined Works Consist Of The Renovation Of The Drinking Water Network In 2 Sectors: Casa Martí - Cal Ros And A Section Of Cal Roc. The Driving To Be Installed Will Be Of High Density Polyethylene D90 10 Atm In A Total Length Of 2,430 M. The Ditch Will Be Made By Mechanical Means, Placing The Tube On A 0-6 Mm Gravel Bed For The Bottom Of The Bottom Of The Ditch, Subsequent Filling With Selected Material From The Excavation Or Contribution Up To 25 Cm Thick, The Rest Of The Landing Will Be Made With Tolerable Material From The Excavation Or Contribution, Compacting It Up To 90 % Of The Pn, Including The Pn, Including The Pn, Including The Pn. It Also Contemplates The Corresponding Pull Of Land For Each Of The Sections. 3 New Embryoned Suction Cups Of Nominal Diameter Of 50 Mm Of Pn16 Will Be Installed To Remove The Air From The Driving And At The Low Points 3 Drains Of D50 To Be Able To Empty The Driving, Distributed Throughout The Route. They Will Be Placed In The Interior Of 1 M Diameter Log Pericons, With Ductile Foundry Registration Lid, Type D-400. There Are Also Manual Entrance Valves As Well As Header Meter. The Driving Layout Contemplates Crossing Vehicles And Some Streams. These Crossings Will Be Made Through A Protected Ditch With A Double -Wall Corrugated Tube D315 Mm, Sn 8Kn/M², For The Protection Of Water Conduits. Including Earth Movement, Filled With Hm-20 Concrete. As Accessory Works, The Following Actions Are Contemplated: - Work Of Cleaning And Conditioning Of The Area Affected By The Execution Of The Works, With Mechanical And Manual Means. Included Review And Adaptation Of Stretches Of Affected Roads. - Surface Installation Of Provisional Pipes To Maintain The Service. Includes The Necessary Connections With The Existing Pipe. - Pallet Grant For Installation Work. Included Labor And Complementary Material. - Connections To The Network Exists
Acquisition Of Cellulose Products, Hygiene Products, Plastic Bags, Cloths And Disposable Surgical Pajamas For The Infanta Leonor University Hospital (12 Lots)
Supply Of Plastic Bags For Part Of The Waste Collection
Supply Of Plastic Bags For Part Of Waste Collection
The Object Of This Project Is The Improvement Of The Pavement And Services Of The Nucleus Of Burgundy Of The Terri. Specifically, The Underground Lines Of Low Voltage And Existing Telecommunications Lines Are Projected. The New Lines Are Projected Specifying Their Characteristics And Drawing, The Conversion Points, The Sections Of The Ditches And The Replains Of The Affected Pavements. The Aim Is To Improve The Service Carried Out In The Village, To Minimize The Effects In Episodes Of Wind Or Snow, Order The Lines And Improve The Image Of The Streets With The Removal Of Sticks And Aerial Wiring. It Is Also Planned To Improve The Drinking Water Supply Network, With The Replacement Of Pvc Pv6 Pipes With Pad Pad Pn10 Polyethylene Pipes, In Order To Minimize The Breakdown At Present. The Project Includes The Solution That Has Been Considered Most Appropriate After Contacting The Supply Companies Of These Services. Finally, And As A Result Of The Affect On The Pavement For The Execution Of The Trenches Of The Services, Which Will Be Badly Damaged, A New Paving Of All The Vials Of The Nucleus Is Proposed.
Acquisition Of Cellulose Products, Cleaning, Plastic Bags, Cloths And Surgical Disposable Pajamas, For The Infanta Leonor University Hospital (12 Lots)
Renewal Of The Municipal Network Of Drinking Water Consisting Of The Replacement Of Fiber Cement Pipes With Polyethylene Pipes In The Urb. Ton Ferrer, Mont Blau And The Tochar Del T.M. Of Torres Torres.
Supply Of 120 Containers For The Collection Of Oils Of Domestic Origin And 180 Plastic Containers For Textile Material Collection, Endowed With Opening Systems By Card And Filling Sensors
Supply Of 120 Containers For The Collection Of Oils Of Domestic Origin And 180 Plastic Containers For Textile Material Collection, Endowed With Opening Systems By Card And Filling Sensors