Provision of laboratory analysis service of drinking, sewerage effluent and food sampling
SUPPLY AND DELIVER A DIESEL WATER PUMP
Provision for conventional and trenchless replacement, augmentation and extention of water network pipelines in the City of Tshwane, (area-A): two (2) year period, as and when required
Provision for construction of stormwater infrastructure in Mabopane extension 1 for a period of 18 months
PROVISION OF UPGRADE OF BINFIELD WATER SUPPLY SCHEME – COMPLETION OF REMEDIAL WORKS ON THE WTW CIVIL WORKS
PROVISION FOR REPLACEMENT OF WATER PIPELINE AT GLEN BERRY AVENUE -SWELLENDAM
Provision Of Garden Services For A Period Of 06 Months At Mdtp At Midmar Dam Nature Reserve- Ezemvelo Kzn Wildlife.
Installation Of Flow Meters And Alterations To Existing Sewer Pumpstations In Velddrif
Appointment Of A Contractor For The Malebogo (Hertzogville): Refurbishment Of Water Treatment Works- Phase 1
Appointment Of A Contractor For Refurbishment And Upgrading Of Hertzogville Waste Water Treatment Works Phase 2
Provision Of Professional And Accredited Laboratory Services For Water And Waste Water Quality Monitoring To Karoo Hoogland Municipality For A Period Of 36 Months
Supply, Service And Repairs To Boilers, Burners, Hot & Cold-Water Tanks, Heat Exchangers, Circulation Pumps And All Other Parts Pertaining To Hot Water Systems At Die Dam & Uilenkraalsmond Holiday Resorts For The Period Ending 30 June 2028
Supply Of Proficiency Testing Scheme Samples Phe - Food And Water Microbiology External Quality Assessment Scheme: Drinking Water, Bottled Water And Recreational Water. Phe -Hpa Norovirus And Hepatitis A Scheme At Analytical Services Microbiology Laboratory
Supplier Listing For Financial Years 2025-2026 And 2026/2027 – Bwasco Water
Tender For The Appointment Of A Contractor For The Construction Of Stormwater Infrastructure In Mabopane Extension 1 For A Period Of 18 Months
The Construction Of The Bulk Water Supply Pipeline From Padda Junction To Thabazimbi Pump Station (Cidb Grading 9 Ce)
Design, Manufacture, Erection And Connection Of A New 500 Kl Prefabricated Steel Reservoir For Potable Water Storage At Voorstekraal.
Provision for Installation of isoil insertion type electro-magnetic flow Phola bulk line to reservoir
Rfq-Maintenance On The Water Pipeline-By 9 October 2025
Rfq-Supply And Install Borehole Pumps At Somopho And Crocodile Dam-By 9 October 2025