Rfq No: 150Amr(25/26) Water Testing Mandatory Requirements -Yes Instrument Quality Certificate: Iso 9001 2015 Manufacturing Facilities, The Bidder Must Submit Proof Of The Iso Standard As Stated Below, Before The Dffe Issues An Official Order To The Bidder, Failure Of Submitting Proof Will Lead To Disqualification. Yes
Umzimkhulu: Department Of Health Riverside Clinic – Construction Of A New Septic Tank, Sewer Reticulation And French Drain: 5 Ce Or Higher
Appointment of a service provider for recycling/disposal of confidential records in Arid Region Parks
Provision of Ledebouria Rupestris Monitoring
Provision of Aloe Simii Assessments
Provision of Stream Condition and Water Quality Assessments
Provision of Enchephalartus Humilus Monitoring
Provision of Helichrysum Lesliei Monitoring
Provision of public relations consultancy to create Brand Ecosystem
Environmental Subservices For The Concept And Preliminary Design For The Realignment Of National Route 3, Sections 3 And 4, From Chota Motala Interchange (Km 12.86) To Cedara (Km 1.6) Contract Sanral N.003-034-2017/9D-Pd1 Env
Supply And Delivery Of Heavy Duty Drain Rods.
Performance And Development Of Water Wise Roadshows
Purchase , Removal And Collection Of Waste Oils (Fuel, Engen, Turbine, Lube, Waste Grease And Mixed Contaminated Oil) At Matimba Power Station For A Period Of 36 Months On “As And When “ Required Basis
Purchase, Removal And Collection Of Scrap Conveyor Belts At Matimba Power Station For A Period Of 36 Months On ‘As And When” Required’ Basis
The Appointment Of A Suitable Service Provider To Compile The 2Nd South Africa State Of Waste Report On Behalf Of The Department (Dffe) For A Period Of Fourteen (14) Months
Sub-Contract For Site Materials Laboratory For The Periodic Maintenance (Preventative) Of National Route R360 Section 1 From Upington (Km 0.00) To Askham (Km 172.06) And National Route R31 Section 1 From Rietfontein (Km 0.15) To Askham (Km 86.44) Nra 2025-0063C-Sl
Environmental Subservices For The Concept And Preliminary Design For The Realignment Of National Route 3, Sections 3 And 4, From Chota Motala Interchange (Km 12.86) To Cedara (Km 1.6) Contract Sanral N.003-034-2017/9D-Pd1 Env
Supply, Delivery And Installation Of Laboratory Equipment 2025/2026
Upgrading of Manzana wastewater treatment works
Installation Of A River Boom In A River In Kwazulu-Natal