Provision for Load Testing and Inspection of Lifting Equipment
The Provision Of Testing, Maintenance And Repairing Of Lifting Equipment In Gauteng Cluster On “As And When Required” Basis Over A Period Of 60 Months
Mwp2770Dx-R- Letter To Extend Validity Period-The Provision Of Testing, Maintenance And Repairing Of Lifting Equipment In Gauteng Cluster On “As And When Required” Basis Over A Period Of 60 Months
SUPPLY DELIVERY AND INSTALLATION OF TWO SERVERS FOR AIR TRAFFIC AND NAVIGATION SERVICES
Joint Monitoring Team (Jmt) To Monitor The Principal Contractor On The Design And Build Of The New Realigned Runway 18/36 At Cape Town International Airport For A Period Of 60 Months
Request For Proposals For The Maintenance, Repair And Rehabilitation Of 03L Runway Threshold Between Taxiway Bravo And Juliet At Airports Company South Africa’S O.R. Tambo International Airport
Design And Build Contractor For O.R. Tambo International Airport Installation Of Taxiway Centre Line Lights
The Appointment Of A Service Provider For The Procurement, Delivery, Installation And Commissioning For The Enhancement Of Electronic Security (Cctv, Alarm And Intercom Systems) At Acsa, Non-Acsa Air Traffic Service Units (Atsu) And Remote Cns Sites.
For Design And Construction Of Paved Access Roads To Runways, Turn Pad For Runway 24, Concrete Apron Refurbishment And Extension Of Taxilane For A Period Of 26 Months At King Phalo Airport.
For Design And Construction Of Paved Access Roads To Runways, Turn Pad For Runway 24, Concrete Apron Refurbishment And Extension Of Taxilane For A Period Of 26 Months At King Phalo Airport.
Names Of Bidders - Routine Service, Load Testing And Ad Hoc Repairs / Replacement Of Lifting Machinery And Lifting Equipment At Acacia, Ankerlig, Gariep, Palmiet, Port Rex And Vanderkloof Power Stations.