28 Live Notices for Southern Africa Water Treatment Tenders
Showing 1 to 20
PROVISION OF REFURBISHMENT AND REPAIR OF A BACKWASH PUMP AT LAING WATER TREATMENT WORKS
PROVISION OF REFURBISHMENT OF GATE VALVES IN NAHOON WATER TREATMENT WORKS HIGHLIFT PUMPS.
PROVISION FOR WATER / WASTE WATER TREATMENT HACH REAGENTS INCLUDING SUPPLYING, MAINTENANCE, SERVICE AND CALIBRATION OF HACH INSTRUMENTS FOR A PERIOD OF 3 YEARS
PROVISION FOR UPGRADING AND AUTOMATION OF MASINGWANENG WATER TREATMENT PLANT [TENDER NO :WUC 025 (2025)
Groenpunt Prison: Operation And Maintenance Of Water And Sewer Treatment Plants (1 Month Contract)
Provision for Nhlangano Water Treatment Plant Pumping Main Pipe Replacement
UPGRADING AND AUTOMATION OF MASINGWANENG WATER TREATMENT PLANT
Provision for Water and Wastewater Treatment – Supply of Hach Reagents, including the Supply, Maintenance, Servicing, and Calibration of Hach Instruments, for a period of three (3) years.
The Appointment Of A Maximum Of Five (05) Contractors On The Panel Of The Maintenance Of Water And Wastewater Treatment Works Infrastructure As And When Required For A Period Of 36 Months
Upgrading Of Joubertina Water Treatment Works
Re-advert: Appointment of a contractor for the upgrading and extension of Bospoort water treatment works mechanical and electrical works
Upgrade And Refurbishment Of Buffels River Water Treatment Works
Upgrade And Refurbishment Of Buffels River Water Treatment Works
Cancellation Letter - Supply And Delivery Of Laboratory And Water Treatment Plant Chemical Reagents
Re-Issue Of The Supply And Delivery Of Laboratory And Water Treatment Plant Chemical Reagents.
Supply, Delivery, Offloading And Dosing Of Clarification Chemicals For Biological Treatment For Concentrated Cooling Water System At Lethabo Power Station For A Five (5) Year Period On An “As And When Required” Basis.
Notification Of Awarded Camden Power Station For Water Treatment Plant Chemical For As And When Required Basis For The Period Of 3 Years At Camden Power Station.
REPAIR AND MAINTENANCE OF COALN FIRED BOILERS,STEAM AND CONDENSATE RETICULATION, WATER TREATMENT FOR BOILERS_2
Supply, Delivery, Offloading And Dosing Of Clarification Chemicals For Biological Treatment For Concentrated Cooling Water System At Lethabo Power Station For A Five (5) Year Period On An “As And When Required” Basis.
Provision for Upgrade and Expansion of Villiersdorp Water Treatment Works – Phase 2