Similar tenders from other countries.
Showing 1 to 20
Delivery Of Gas Internal Combustion Turbines With Accessories
Implementation of three Shelter sets for ED and F gas turbines of methanol power plant
Supply of spare parts for the non-return valves of the low-pressure system (HRSG) for the combined-cycle gas turbines, first phase, at Al-Zour South Station
Supply Of Pulse Type Self-Cleaning Inlet Air Filters For ‘D’ Station Re-Powering Gas Turbines, Jebel Ali
Outsourcing / Hiring Of Scaffolding Services Including Scaffolding Material For Gas Turbines And Bop At Japs & ‘H’ Station In Generation Division
Purchase order for a non-return valve for the water cooling towers of the combined cycle gas turbines
Supply of BARTOM 7400 GAS TURBINE FLOWMETER Gas Meters
Hotd Extended Warranty Agreement Co-Gen
Supply of steam turbine parts ruptur disc
Supply of Purchase order for cleaning ball circulation pumps inside the condenser tubes for steam units Nos. (50 & 60) in the first phase of the combined cycle gas turbines at the Al-Zour South Station
New Repeater Assembly Gas Turbines, Heat Recovery Boilers And Steam Turbines
Provision Of Refurbishment Services And Osm Upgrade For Phase 3 Power Plant
Provision of Overhaul of Gas Turbine Engines
Construction Of Gas And Steam Blocks And Service Services
Construction Of Gas And Steam Blocks And Service Services
295125980
Ocgt Gas Power Plant Rybnik
The Realization Of An Energy Audit For The 9001St Gas Turbine Power Plants In Bouchemma And The Combined Multi-Arbres Cycle Step B Sousse Of The Steg Electricity Production Park
Publication Of Bidders For Enquiry No. E1252Gxpou: Refurbishment Of V94.2 Sgt5-2000E Version 6 Gas Turbines, Including The Supply Of Capital Spares, Special Tools, Required Resources, And Generator Rotor Removal, For The Nine (9) Peaking Generation Open Cycle Gas Turbine (Ocgt) Units At Ankerlig Power Station Over A Five-Year Period
Publication Of Bidders For Enquiry No. E1252Gxpou: Refurbishment Of V94.2 Sgt5-2000E Version 6 Gas Turbines, Including The Supply Of Capital Spares, Special Tools, Required Resources, And Generator Rotor Removal, For The Nine (9) Peaking Generation Open Cycle Gas Turbine (Ocgt) Units At Ankerlig Power Station Over A Five-Year Period