10 Live Notices for South Asia Wind Tenders
Showing 1 to 10
Procurement Of Short Term Grid Connected Wind Power Through Tariff Based Competitive Bidding Process
Ram Hydraulic Ram Assy , Valve Graduated Handcontrol , Wind Screen Vehicular Glass Wind Screen, Master Cyl Power Unit Clutch Master Cyl , Slavecyl Clutch , Spigot Bearing Quantity: 22
Custom Bid For Services - Premium Estimate For Segment Imine 2 Mine 1 Mine 1A Bmp Card Mm Complex Tps 1 Activeand Other Service Units And Registered Office At Chennai Forthe Period 01072025 To 30062026 , Custom Bid For Services- Premium Estimate For Segment Ii Tps 2 Stage I And Stageii And Public Liability Act 1991 For The Period 01072025 To30062026 , Custom Bid For Services - Premium Estimatefor Segment Iii Nntps Btps And 500 Mw Solar For 6Locations For The Period 01072025 To 30062026 , Custombid For Services - Premium Estimate For Segment Iv Tps 1E Tps 2 E Solar 709 Mw 130 Mw 10 Mw 1060 Kw 10 Mwcspp 2X10 Mw Solar Power Plant At Andaman 200 Kwfloating Solar At Nntpp Lake And Wind Power For 34Independent Locations For The Per. Quantity: 4
Pkg-I - Undersea Power Cable Package (Ca-01) For 220Kv Undersea Export Power Cable And Underground Land Cable Under Development Of Transmission System For Offshore Wind Zone Phase-I (500 Mw Vgf) Off The Coast Of Gujarat For Subzone B3
Clutch Disc Drive Front , Driven Disc , Doublesafety Valve , Drive Assy , Rear Support Pad ,Weather Strip Wind Shield , Power Cylinder Hose ,Suction Pipe Assy , Connecting Hose For Oil Coller ,Pipe Left Hand , Pipe Assy From Valve To Rear Axlebrk , Gear Box Selector Tower Rep Kit , Pipe Assyfrom Air Cyl To Manual Control Valve , Branch Pipe, Air Pipe Assy , Gear Box Kit Complete Quantity: 22
Rfs For Allocation Of Sea-Bed Lease Rights For 4000 Mw Offshore Wind Power Projects
Rfs For Setting Up Of 500 Mw Ists-Connected Offshore Wind Power Project In India (Tranche-I)
Pkg-I - Undersea Power Cable Package (Ca-01) For 220Kv Undersea Export Power Cable And Underground Land Cable Under Development Of Transmission System For Offshore Wind Zone Phase-I (500 Mw Vgf) Off The Coast Of Gujarat For Subzone B3
Rfs For Setting Up Of 500 Mw Ists-Connected Offshore Wind Power Project In India (Tranche-I)
Rfs For Setting Up Of 500 Mw Ists-Connected Offshore Wind Power Project In India (Tranche-I)