32 Live Notices for South Asia Hospital Beds Tenders
Showing 1 to 20
"Establishment Of Cancer Unit At Medical College Hospital Of Eight Divisional Head Quarter "One At Khulna Medical College Hospital, Khulna (Subhead: Sewerage Treatment Plant (Stp))
Yearly Operation And Maintenance Of 1250 Kg 8 Stop 2 Nos Bed Lift At 250 Bedded Sadar Hospital Sunamganj Fy: 2025-2026.
Annual Maintenance, Servicing And Operation Of 2 (Two) Passenger Elevators And Bed Elevators With 4 Stops Of Fujiyada Brand With Capacity Of 1000 & 1200 Kg In 250 Bedded General Hospital Building In Brahmanbaria District.(Duration: From 01/07/2025 To 30/06/2026 Ad)
Pabna 250 Bed Sadar Hospital 2Nd Floor All Corridor Floor & Wall Tiles Installation Works. Fy: 2024-25
Yearly Operation, Servicing And Maintenance Works (From 01-07-2025 To 30-06-2026) Of 5-Stop No. 2 Bed Lift (Mp Brand) And No. 2 Passenger Lift (Mp Brand) Of Sylhet Mag Osmani Medical College Hospital. Fy: 2025-2026.
Yearly Operation, Servicing And Maintenance Works ( From 01-07-2025 To 30-06-2026) Of 5-Stop (Otis Brand) No. 2 Bed Lift Of Sylhet Mag Osmani Medical College Hospital. Financial Year: 2025-2026.
Remaining Finishing & Ancillary Works Of Cancer Hospital Building At Barishal Medical College, Barishal.
Yearly Operation, Servicing And Maintenance Works ( From 01-07-2025 To 30-06-2026) Of No. 1 2-Stop Bed Lift (Schneider Brand) Of Icu Building, No. 1 6-Stop Passenger Lift (Schneider Brand) Of Nursing College And 10-Stop No. 2 Bed Lift (Schneider B.
Establishment Of Cancer, Kidney & Heart Disease Unit At 8(Eight) Divisional Medical College Hospital (1St Revised) One At Barishal Medical College Hospital. ((Sub-Head: Lightning Protection System, Compound/Security Light))
Establishment Of Cancer, Kidney & Heart Disease Unit At 8(Eight) Divisional Medical College Hospital (1St Revised) One At Barishal Medical College Hospital. (Sub-Head: Rain Water Harvesting)
Establishment Of Cancer, Kidney & Heart Disease Unit At 8(Eight) Divisional Medical College Hospital (1St Revised) One At Barishal Medical College Hospital. (Sub-Head: Remaining Of Sinking Of Deep Tube Well At Hospital Compound)
Yearly Servicing, Maintenance & Operational Work For Fiscal Year 2025 To 2026 Of One Nos 5-Stop, 1250 Kg Bed Lift At Moulvibazar District 250 Bed Hospital (Working Period: 01/07/2025-30/06/2026 = 12 Months). F.Y: 2025-2026.
Yearly Maintenance & Operational Work For Fiscal Year 2025 To 2026 Of 165 Kva Generator Installed In Moulvibazar 250 Bed Hospital (Activity Period=01/07/2025 To 30/06/2026) . Fy: 2025-2026.
Upgradation Of Existing 500 Ma X-Ray System Into Digital Image System Of 04 Public Hospitals (250 Bed General Hospital, Munsiganj; 250 Bed General Hospital, Kishoreganj; Shaheed Shamsuddin Ahamed Hospital, Sylhet And Shaheed Ahsanullah Master Gene.
Upgradation Of Existing 500 Ma X-Ray System Into Digital Image System Of 04 Public Hospitals (250 Bed General Hospital, Feni; 250 Bed General Hospital, Bhola; 250 Bedded Mohammad Ali Hospital, Bogura And 250 Bed General Hospital, Bagherhat) In Bangladesh.
Yearly Operation, Servicing & Maintenance Of Existing 02 Nos 1250 Kg, 8 Stops Passengers Cum Bed Lift Of Sunny Brand, At Habiganj 250 Bed District Hospital, Habiganj . Fy: 2025-26
Rev/N.Ganj/Sad/2024-25/63 1). Maintenance & Reformation Of Government Aashray Kendray At Godnail Under Narayanganj. 2). Distribution Of 100 Chicken House For Raising Local Chickens In Al Upazila Of Narayanganj District. 3). Repair Of Sewer.
Establishment Of Cancer Unit At Divisional Medical College Hospital Of Eight Divisional Head Quarters One At Khulna Medical College Hospital, Khulna. (Sub-Head-A: Supply & Installation Of 2500 Kg Bed Lift (02 Nos), 2500 Kg Cargo Lift (01 Nos),.
Construction For Infrastructure Up-Gradation Of Kaliyaganj State General Hospital From 60 Beds To 250 Beds (Residential Part, Non- Residential Part, Elect Part, And It Infrastructure Work)Uttar Dinajpur-External Electrification Works.
Amc Of One No. Passenger Cum Bed Elevators Installed In Kamla Nehru State Hospital For Mother And Child At B-Block Shimla. For The Period Of 3 Years.