66 Live Notices for South Asia Highway Construction Tenders
Showing 1 to 20
1. Construction Of Rigid Pavement With Approach Road At Ch:- 0+000 To Ch:- 0+060, Ch:- 0+060 To Ch:- 0+110, Ch:- 0+470 To Ch:- 0+560, Ch:- 0+720 To Ch:- 1+210, Ch:- 2+065 To Ch:- 2+085, Ch:- 2+255 To Ch:- 2+275, Ch:- 2+310 To Ch:- 2+340, C.
Construction Of Bakaiya Bridge And Approach Roads (Design And Build) From Ch. Km. 346+800 To 347+520 Along Bagmati Bridge -Pathlaiya Section Of Mahendra Highway
Construction Of Bakaiya Bridge (Design And Build) At Km 313+117) Along Kamala-Dhalkebar- Bagmati Section Of Mahendra Highway
1. Upgrading Road By Uni-Block Starting From Madargong Highway To Boghabari Road (Bodan Hazi Pond) Ch.00-250 (Ward-11). Salvage=68611.00/-.(Will Be Deduct From Billing Amount) 2. Upgrading Road By Uni Block Starting From Hirusarak To Nazru.
Construction Of New Jersey Barrier To Close Un-Authorized U-Turn From Chainage 166Th(P) Km To 225Th(P) Km (Dhumghat To Bhatiary) Of Dhaka -Chattogram National Highway (N-1) Under Chattogram Road Division During The Year 2024-2025.
Construction Of 2000.00M Rigid Pavement At Ch: 170+358 To 171+000 (Basundia Nita Group), Ch: 176+562 To 177+120 (Bhanga Gate, Noapara Filling Station), Ch: 179+848 To 180+248 (Noapara Bazar) & Ch: 182+300 To 182+700 (Akij City) Of Daulatdia-Faridpur (Goalchamot)-Magura-Jhenaidah-Jashore-Khulna-Mongla (Digraj) National Highway (N-7) Under Jashore Road Division During The Year 2024-2025
Construction Of 2000.00M Rigid Pavement At Ch: 152+850 To 152+950 (Monir Filling Station), Ch: 153+400 To 153+500 (Chaklader Filling Station), Ch: 155+760 To 155+960 (Murali), Ch: 161+400 To 161+775 (Rupdia Bazar), Ch: 166+000 To 166+560 (Singia), Ch: 168+908 To 169+300 (Basundia) & Ch: 170+085 To 170+358 (Basundia Nita Group) Of Daulatdia-Faridpur (Goalchamot)-Magura-Jhenaidah-Jashore-Khulna-Mongla (Digraj) National Highway (N-7) Under Jashore Road Division During The Year 2024-2025
Construction Of The Pale Road To The Kabul Gardez Highway (3 Phase)
O & M Of Hazrat Shahjalal International Airport, Kurmitola, Dhaka During The Year 2024-2025 (S:H:- Re-Strengthening Of Dhaka Mymonshing Highway To Domestic Access Road And Construction Of A New Drain In/C. Other Associated Works) At Hsia, Kurmitola, Dhaka.
Re-Construction Of Flexible Pavement, Construction Of Rigid Pavement, Construction Of Bridge & Culvert And Protective Work From Ch. 18+000 To Ch. 26+000 Km Of Jamalpur (Madarganj)-Koyra-Mansurnagar (Kazipur)-Abdullah More (Sarishabari)-Tangail (Dhanbari) Zilla Highway (Z-4029) Under Jamalpur Road Division (Wp-3).
Earth Work, Construction Of Flexible Pavement, Rcc Box Culvert (05 Nos) & Bridge (2 Nos), Drain And Protective Work From 20Th (P) Km (Ch.19+880M) To 27Th (P) (Ch.26+890M) Km Of Bhulta-Araihazar-Bancharampur-Nabinagar-Shibpur-Radhika R-203, (Ko.
Earth Work, Construction Of Flexible Pavement, Rcc Box Culvert (11 Nos) & Bridge (1 Nos), Drain And Protective Work From 41St (P) Km (Ch.40+280M) To 49Th (P) (Ch.48+600M) Km Of Bhulta-Araihazar-Bancharampur-Nabinagar-Shibpur-Radhika R-203, (Ko.
Kcc/Idsrwlp/Xen/Zone-A/2023-24/W-38 Construction Of Drain Including Slab From Muzgunni Highway Road Kda Park To Khude Khal. Drain: From Ch. 0+000 Km To Ch. 1+776 Km, Total Drain Length=1.776 Km, Dpp-Cs 8
Construction Of 2000.00M Rigid Pavement At Ch: 152+850 To 152+950 (Monir Filling Station), Ch: 153+400 To 153+500 (Chaklader Filling Station), Ch: 155+760 To 155+960 (Murali), Ch: 161+400 To 161+775 (Rupdia Bazar), Ch: 166+000 To 166+560 (Singia),.
Construction Of 2000.00M Rigid Pavement At Ch: 170+358 To 171+000 (Basundia Nita Group), Ch: 176+562 To 177+120 (Bhanga Gate, Noapara Filling Station), Ch: 179+848 To 180+248 (Noapara Bazar) & Ch: 182+300 To 182+700 (Akij City) Of Daulatdia-Fa.
Re-Construction Of Flexible Pavement, Construction Of Rigid Pavement, Construction Of Bridge & Culvert And Protective Work From Ch. 18+000 To Ch. 26+000 Km Of Jamalpur (Madarganj)-Koyra-Mansurnagar (Kazipur)-Abdullah More (Sarishabari)-Tangail.
Earth Work, Construction Of Rigid Pavement, Flexible Pavement (Widening & Strengthening), Surfacing, Bridge (1 No) And Protective Work At 19Th Km To 26Th (P) Km (Ch. 18+000 M To 25+128M) Of Sarail-Nasirnagar-Lakhai Road (R-220) Under Road Divi.
Earth Work, Construction Of Rigid Pavement, Flexible Pavement (Reconstruction, Widening & Strengthening), Surfacing, Drain (Rcc U Drain & Brick Masonry U-Drain) And Protective Work At 1St Km To 6Th Km (Ch.0+000 M To Ch.6+000 M) Of Sarail-N.
Earth Work, Construction Of Rigid Pavement, Flexible Pavement (Widening & Strengthening), Surfacing, Rcc Box Culvert (2 Nos) And Protective Work At 13Th Km To 18Th Km (Ch.12+000M To 18+000M) Of Sarail-Nasirnagar-Lakhai Road (R-220) Under Road .
Gcc/2-02-03/R-25 (1) A) Construction Of Bc Work From Moiran Highway Road Satalite School To Jhajor Dhirassrom Road Edgah Via Faruk House,.