5248 Live Notices for SAARC Road Construction Tenders
Showing 1 to 20
Ward No.6 Ma Shree Lal Sir Ko Boarding Dekhi Belahiya Bajar Jane Adhuro Sadak Dhalan Karya.
Construction Of Internal Access Road From Ch 0+000 To 0+260 At Phedhikhola-01, Gurdhum, Syangja
Earth Work, Construction Of Flexible Pavement, Rcc Box Culvert (06 Nos) & Bridge (2 Nos), Drain And Protective Work From 27Th (P) Km (Ch.26+890 M) To 36Th (P) (Ch. 35+350 M) Km Of Bhulta-Araihazar- Bancharampur- Nabinagar- Shibpur-Radhika R-203, (Korikandi To Bancharampur - Nabinagar) Under Road Division, Brahmanbaria During The Year 2024-2025.
Earth Work, Construction Of Rigid Pavement, Flexible Pavement (Widening & Strengthening), Surfacing, Rcc Box Culvert (2 Nos) And Protective Work At 13Th Km To 18Th Km (Ch.12+000M To 18+000M) Of Sarail-Nasirnagar-Lakhai Road (R-220) Under Road Division, Brahmanbaria During The Year 2024-2025
Earth Work, Construction Of Rigid Pavement, Flexible Pavement (Reconstruction, Widening & Strengthening), Surfacing, Drain (Rcc U Drain & Brick Masonry U-Drain) And Protective Work At 1St Km To 6Th Km (Ch.0+000 M To Ch.6+000 M) Of Sarail-Nasirnagar-Lakhai Road (R-220) Under Road Division, Brahmanbaria During The Year 2024-2025.
Construction Of Rcc Cross Drain At Different Km Of Santahar(Naogaon)-Atrai (R-544) Road Under Rhd Road Division, Naogaon During The Year 2024-2025.
Construction Of New Demarcation Pillar At Sunamganj-Kachirghati-Bishamberpur Road (Z-2804) Of Sunamganj Road Sub-Division Under Sunamganj Road Division During The Year 2024-2025.
The Road Development Project From Shahid Square To Final Station Of Kabul University, Connecting To Private Silo Road (Naseeb Hotel) And Construction Of A Canal Starting From The Fifth Silo Road To Dehbori Square
The Construction Project Of The Hazara Bagh Road From Point 315 Towards Munshi Mir Ghulam Township (Lot 1)
Construction Of R.C.C Road Works.
Rdridp/Chapi/Shibganj-70/24-25 A)Improvement Of Shahapara Bazar - Shahapara Bottola Bazar Mour Via Chillahipara Monakasha Up Road At Ch.00-3042.00M B)Construction Of 05Nos U-Drain Size 0.625M X0.600M At Ch.1296M, 1440M, 1995M,2436M &Am.
Rdridp/Chapi/Shibganj-68/24-25 Improvement Of Mastan Bazar-Adina College Via Khonda Rngps Monakosha Up Road From Ch.00-2650.00M & Construction Of 04 Nos U-Drain Size 0.625M X0.600M At Ch.1100M, 1380M, 1465M,& 1945M On Same Road.
Scrdp-Uk-U-Rb27 Construction Of Rcc Road From Rahamaterbill-Damonkhali Road (Id-4229455106) At Ukhiya Upazila, Cox'S Bazar District.
Dismantling Of Existing Main Gate, Associate Road, Boundary Wall And Construction Of New Main Gate, Associate Road And Boundary Wall Of Jamalpur Grid Substation Under Gmd-Mymensingh, Power Grid Bangladesh Plc
Civil Works For Repair Of Internal Road, Construction Of Dustbin, Student Seating Bench At Various Places Of Jagannath University Campus.
Special Repair Work Including Interior And Exterior Polishing/Painting Of Doors And Thai Window, Chemical Treatment Of Roof Of Residence, Repair Of Water Reservoir, , Anti-Termite Treatment, Construction Of Drains, Demolition Of Old Toilet And Gar.
Construction Of Box Culvert At Sundalpur South-1 Approach Road, Companigonj , Noakhali
Cleaning Of Mosaics Of Ground Floor And 1St Floor Floor Of Government Residence No-M-3, Hare Road, Dhaka And Changing Bathroom Tiles, Changing Sanitary Fittings, Changing Doors And Windows, Construction Of Police Shed And Other Related Special Repair Work.
Construction Of Rigid Pavement Work In Different Chainage Including Bazar Portion Of Chatkhil-Chitoshi-Shaharasti (Kalibari) Road (Z-1430), Paniwala-Dalta-Munshirhat-Chatkhil (Purbo Bazar) Road (Z-1417) & Lakshmipur-Dattapara-Chatkhil Road (Z-.
Construction Of Rcc Road With Gate From Govt. Vehicle Workshop To Phoenix Road At Osmani Udyan, Dhaka.