164 Live Notices for SAARC Railway Construction Works Tenders
Showing 1 to 20
Remaining Works Of Construction Of 04 (Four) Storied Ration Store With 08 (Eight) Storied Foundation At District Police Line, Halishahar,Chittagong (Louver,Lift Wall Tiles, Pump House,Collapsible Gate And Porda Rail Pipe)
Installation Of Rail In Railway Washing Chamber,Construction/Maintenance Of Railway Cargo Yard And Protection/Maintenance Of Railway Structures In Jayanagar-Bhangaha Railway Section.
Proposals For Supply Of Brand New Right Hand Driven Vehicle
Construction Of Ramp At Boalmari End With Nehemah Ae Wall, Pavement Work With Other Anciliary Work At Satior Railway Overpass At 15Th Km Of Faridpur(Maijkandi)-Boalmari-Gopalganj(Bhatiapara) Road (Z-7001) Under Road Division Faridpur During The Year 2025-2026.
Construction Of Pc Girder (P9-P10) & Rcc Girder (P8-P9) And 3.00 Nos Rcc Slab (P8-P9, P9-P10 & P11-P12) With Other Ancilary At Satior Railway Overpass At 15Th Km Of Faridpur(Maijkandi)-Boalmari-Gopalganj(Bhatiapara) Road (Z-7001) Under Road Division Faridpur During The Year 2025-2026.
Construction Of Ramp At Satior End With Nehemah Ae Wall, 2(Two) Span Rcc Girder (P10-P11 & P12-P13) And 2.00 Nos Rcc Slab (P10-P11 & P12-P13), Pavement Work With Other Anciliary Work At Satior Railway Overpass At 15Th Km Of Faridpur(Maijkandi)-Boalmari-Gopalganj(Bhatiapara) Road (Z-7001) Under Road Division Faridpur During The Year 2025-2026.
Remaining Works Of Widening, Construction Of New Pavement, Strengthening, Surfacing (Dbs), Construction Of Rigid Pavement, Retaining Wall,Protective Work, Rcc/ Pc Girder Bridge (2 Number), Rcc Box Culvert (8 Number), Road Marking, Sign Sig...
Construction Of 6" Dia X 1.5 Km X 350 Psig High Pressure Gas Pipeline At Rajshahi Bscic Industrial Area-2 28.18.0000.000.047.35.001.25-Rajshahi Bscic 1.5Km
Construction Of Ramp At Boalmari End With Nehemah Ae Wall, Pavement Work With Other Anciliary Work At Satior Railway Overpass At 15Th Km Of Faridpur(Maijkandi)-Boalmari-Gopalganj(Bhatiapara) Road (Z-7001) Under Road Division Faridpur During The Year 2025-2026.
Construction Of Ramp At Satior End With Nehemah Ae Wall, 2(Two) Span Rcc Girder (P10-P11 & P12-P13) And 2.00 Nos Rcc Slab (P10-P11 & P12-P13), Pavement Work With Other Anciliary Work At Satior Railway Overpass At 15Th Km Of Faridpu.
Construction Of Pc Girder (P9-P10) & Rcc Girder (P8-P9) And 3.00 Nos Rcc Slab (P8-P9, P9-P10 & P11-P12) With Other Ancilary At Satior Railway Overpass At 15Th Km Of Faridpur(Maijkandi)-Boalmari-Gopalganj(Bhatiapara) Road (Z-7001) U.
D-1953-Construction Of Rcc Drain From Char Jawgora To Gobodia Boroikandi. (Drain Length= 1200 M) D-1956-Construction Of Rcc Drain With Cc Road At Roghurampur Boilda Para Abu Bokkor Member House. (Length=340M) D-1957-Construction Of Rcc Drain From .
Construction Of (I) 10" Dia X 9.20 Km X 150 Psig, (Ii) 6" Dia X 2.30 Km X 500 Psig And (Iii) 4" Dia X 1.20 Km X 150 Psig Pipeline Construction From Korora (Al-Amin Cng) To Olipur (Rail Gate), Shahjibazar, Hobigonj.
Test
Construction (New And Repair Works) To Karnataka Public School At Rawoor Village In Chittapur Taluka Under Samagra Shikshana Kps Education Fund For The Year 2023-24
Lac-Ads-2024-25 Construction Of Barrier Free Toilet, Providing Sheet Roofing And Interlock Tile Work -In Govt Girls Higher Secondary School, N Paravur-General Civil Work
Construction Of Road From Nimtal Bus Stand To Khudika Railway Ghat Via Kalitala Within Salanpur Block In The District Of Paschim Bardhaman For 2025-2026
Construction Of Out Fall Drain At Railway Station Road To Nallakunta Anjaneya Swamy Arch (Rech Iii) In Nallapadu In Div.No.27 In Ae-3 Section. Recall
Construction Of Out Fall Drain At Railway Station Road To Nallakunta Anjaneya Swamy Arch (Rech Ii) In Nallapadu In Div.No.27 In Ae-3 Section. Recall
Construction Of Cc Road From Barapukur To Rail Line Par At Sehara Uttar Roy Para Sansad No-Vii Under Sehara Gp Within Raina-1 P.S Under 15 Th Cfc (Untied) -2025-2026 Activity Code-(112229445)