83 Live Notices for SAARC Highway Construction Tenders
Showing 1 to 20
Construction Work Of 2-Storied Building On 6-Storied Foundation Pangsha(Rajbari) Highway Thana ( Sub-Head: Palisading Work To Protect The Soil Around The Building) Under Highway Police Madaripur Region, Faridpur.
Baika Bajar Sunar Tol Hudai Toraya Health Post Jodne Sadak Starunnati Dullu-11,Dailekh.
Construction Of R.C.C U-Drain, R.C.C Cross-Drain, Walkway, Fencing & Repairing Of Exiting Pavement With Aggregate Base Type-Ii, Premix Bituminous Carpeting, Seal Coat And Hbb Work At Ch. 208+000 Km Of Doulatdia-Faridpur (Goalchamot)-Ma.
28.14.0000.829.02.001.25/Re
Construction Of Emergency Retaining And Breast Structures At Landslide Affected Area In Midhill Highway (Nh-03), Khodpe-Chainpur Highway (Nh-64) And Mahakali Highway (Nh-66)
Dhuseni Majhifeda Bila Sadak Wada No. 3 Ra 4
Upgradation Of Road Along Taku-Hudiphant-Swara-Saurpani-Ranchok-Pokhari Hudai Barpak, Gorkha
Upgradation Of Bp Highway-Ranachhap-Thulichaur Road And Upgradation Of Milanchowk Motorable Road
Construction Of Khawa-Saraswoti School-Bp Highway Niskine Sadak
Construction Of Rigid Pavement At Ch. 24+558 Km To Ch. 24+690 Km (Millpar) Bhaluka-Sakhipur Zila Highway (Z-3030) Under Tangail Road Division During The Year 2025-2026.
Construction And Upgrading Of Road Works Along Sainamaina Ring Road And East West Highway Connecting Road, Sainamaina Rupandehi, Rdbtl/33701169/082/83-05
Construction Of Rigid Pavement Work From Ch. 00+100M To Ch. 00+124M (Afil Gate) Total Length = 24.00M Of Khulna Town Bypass National Highway (N-709) Under Road Division, Khulna During The Year 2025-2026. (Major-3258110)
Construction Of Rigid Pavement Work From Ch. 201+000M To Ch. 201+030M (Fulbarigate) Total Length = 30.00M Of Dauladia-Faridpur(Gaolchamot)-Magura-Jhenaidah-Jashore-Khulna-Mongla-Digraj National Highway (N-7) Under Road Division, Khulna During The Year 2025-2026.
Construction Of Remaining Works With Earth Embankment, Construction Of New Pavement (5.50M), Surfacing By Dbs Wearing Course, 1 Nos Bridge(202.45M), 2 Nos Intersection, R.C.C Box Culvert 6 Nos ( 12M), Saucer Drain, R.C.C Protective Work, Sign Sign.
Construction Of Rigid Pavement Work From Ch. 201+000M To Ch. 201+030M (Fulbarigate) Total Length = 30.00M Of Dauladia-Faridpur(Gaolchamot)-Magura-Jhenaidah-Jashore-Khulna-Mongla-Digraj National Highway (N-7) Under Road Division, Khulna During The Year 2025-2026.
Construction Of Rigid Pavement Work From Ch. 00+100M To Ch. 00+124M (Afil Gate) Total Length = 24.00M Of Khulna Town Bypass National Highway (N-709) Under Road Division, Khulna During The Year 2025-2026. (Major-3258110).
Construction For 4-Bar Gas Distribution Pipeline Of Different (3/4", 1", 2", & 6") Diameters Including, Cleaning, Coating, Wrapping, Welding, Road Crossing, Khal Crossing, Road Breaking, Rcc Coating, Hook-Up, Radiography, Valve Pit Const.
Construction Of Rigid Pavement At Ch. 24+558 Km To Ch. 24+690 Km (Millpar) Bhaluka-Sakhipur Zila Highway (Z-3030) Under Tangail Road Division During The Year 2025-2026.
Construction Of Ground Floor'S Remaining Work And Construction Of 1St And 2Nd Floor Work Of 6-Storied Foundation Building At Tularampur (Narail) Highway Police Thana Under Highway Police Khulna Region.
Construction Of Side Drain And Structural Works In Satbanjh-Gokuleshwar Section, Ch: 18+000-32+000 Of Mahakali Highway (Nh-66)