78 Live Notices for SAARC Highway Construction Tenders
Showing 1 to 20
B.P. Highway-Majhidanda To Swargadwari Road Construction Work, Kamalamai Municipality-7, Sindhuli
Repairing Work For Damaged Portion At 34Th Km (P), 35Th Km(P) & 36Th Km (P) (Chowmuhani Bazar & Chowrasta) And Construction Of Footpath & Slab Cover For Rcc U-Drain At 36Th Km (P) Of Feni-Noakhali National Highway (N-104) Under Noakhali Road Division During The Year 2025-2026.
Construction Of 2Nd & 3Rd Floor Remaining Work (Civil, Sanitary, Electrical, Internal Road, Sentry Box And Saluting Dice) Of Pangsha Highway Thana (Rajbari) Having 06 Storied Foundation Under Highway Police Madaripur Region, Faridpur.
Double Lane Raod Construction Work From Belhi Bhansar To East West Highway Kushaha Bazar Balan Bihul Saptari
Construction Of Rigid Pavement At Ch. 2+700 Km To Ch. 2+748 Km (Hatubanga) & Ch. 9+110 Km To Ch. 9+188 (Bashtoil) Of Mirzapur (Gorai)-Sakhipur Zila Highway (Z-4011) Under Tangail Road Division During The Year 2025-2026.
Repairing Work For Damaged Portion At 34Th Km (P), 35Th Km(P) & 36Th Km (P) (Chowmuhani Bazar & Chowrasta) And Construction Of Footpath & Slab Cover For Rcc U-Drain At 36Th Km (P) Of Feni-Noakhali National Highway (N-104) Under Noakhali Road Division During The Year 2025-2026.
Remaining Works Of Widening, Construction Of New Pavement, Strengthening, Surfacing (Dbs), Construction Of Rigid Pavement, Retaining Wall,Protective Work, Rcc/ Pc Girder Bridge (2 Number), Rcc Box Culvert (8 Number), Road Marking, Sign Sig...
Blacktopped Road Construction Works Including Related Structural Works Along Madan Bhandari Marg Ko Damak 2, Beldangi 01 Bata Sarasawati Marg, Gajkali Marg, Belchowk, Purano 2 No Wada Karyalaya , Malpot Hudai Damak 4 Asian Highway Jodne Sadak,Damak,Jhapa
Construction Of Different Size P.C. Girder Bridge And Rcc Girder Bridge (10 Nos) At Ch.110+893M, Ch. 110+900M, Ch. 112+303M, Ch. 118+495M, Ch. 128+694M & Ch. 132+334.33M Comilla -Lalmai-Chandpur-Lakshmipur-Begumgonj Regional Highway Road (R-140) And Ch. 14+141M, Ch. 16+239M, Ch. 22+227M & Ch. 35+298M Of Begumgonj- Sonaimuri-Ramgonj Road (R-142) Under Noakhali & Lakshmipur Road Division During The Year 2024-2025.(Pw-10)
Construction Of 6" Dia X 1.5 Km X 350 Psig High Pressure Gas Pipeline At Rajshahi Bscic Industrial Area-2 28.18.0000.000.047.35.001.25-Rajshahi Bscic 1.5Km
Construction Of Different Size P.C. Girder Bridge And Rcc Girder Bridge (10 Nos) At Ch.110+893M, Ch. 110+900M, Ch. 112+303M, Ch. 118+495M, Ch. 128+694M & Ch. 132+334.33M Comilla -Lalmai-Chandpur -Lakshmipur-Begumgonj Regional Highway Road (R-1.
Remaining Works Of Construction Of 1 No P.C/R.C.C Girder Bridge On Chitolmari- Tungipara (Patgati) (Z-7054) Zilla Highways & Construction Of 3 Nos P.C/R.C.C Girder Bridge At Different Location On Noapara-Bagerhat-Pirojpur (R-770) Regional Highway Under Construction Of Concrete Bridge In Existing Narrow & Damaged Concrete Bridge/Bailey Bridge On Highways Under Khulna Zone'' Project Under Road Division Bagerhat During The Year 2025-2026 (Wp-04 (A))
Remaining Works Of Construction Of 10 Nos Pc/Rcc Girder Bridges At Different Location On Fakirhat (Diabari) Madrashaghat-Mollahat (Boalia) Road (Z-8409 ) Of Road Division, Bagerhat Under ''Construction Of Concrete Bridges In Existing Narrow & Damaged Concrete Bridge/Bailey Bridge On Highway Under Khulna Zone'' Project During The Year 2025-2026 (Wp-02(A)).
Construction Of Axle Load Control Station Infrastructure Including Canopy Building & Toll Plaza At Sonahat Bridge Approach Under The Project Construction Of Sonahat Bridge Over The Dudhkumor River At Bhurungamari- Sonahat Landport- Bhitorband- Nageshwari Highway Under Road Division, Kurigram During The Fy 2024-2025.(Pw-02).
New Construction/Re-Construction, Widening, Strengthening Of Flexible Pavement, Construction Of Rigid Pavement, Construction Of Road Embankment, Construction Of Drain And Protective Work From Ch. 14+000 To Ch. 21+000 Km Of Digpaith-Sarishabari-Tarakandi (Z-4023) Zilla Highway Under Jamalpur Road Division. (Pw-3)
Re-Construction, Widening, Strengthening Of Flexible Pavement, Construction Of Culvert, Construction Of Rigid Pavement, Construction Of Road Embankment, Construction Of Drain And Protective Work From Ch. 02+690 Km To Ch. 07+600 Km Of Digpaith-Sarishabari-Tarakandi (Z-4023) Zilla Highway Under Jamalpur Road Division. (Pw-1)
Construction Of Axle Load Control Station Infrastructure Including Canopy Building & Toll Plaza At Sonahat Bridge Approach Under The Project Construction Of Sonahat Bridge Over The Dudhkumor River At Bhurungamari- Sonahat Landport- Bhi.
Remaining Works Of Construction Of 10 Nos Pc/Rcc Girder Bridges At Different Location On Fakirhat (Diabari)-Madrashaghat-Mollahat (Boalia) Road (Z-8409 ) Of Road Division, Bagerhat Under ''Construction Of Concrete Bridges In Existing Narro.
Remaining Works Of Construction Of 1 No P.C/R.C.C Girder Bridge On Chitolmari- Tungipara (Patgati) (Z-7054) Zilla Highways & Construction Of 3 Nos P.C/R.C.C Girder Bridge At Different Location On Noapara-Bagerhat-Pirojpur (R-770) Regio.
Provision of Design Review & Construction Supervision for Reconstruction of National Highway N-5 Under Pakistan’s Resilient Recovery, Rehabilitation and Reconstruction Framework Project