Festive Lighting Services In Oradea Municipality 2025-2026
"Provision, Installation And Commissioning Of Automation Systems, Integrated Digitization Solution" Within The Project "Digitalization Saj Caras Severin"
Providing Equipment, Including Installation, Installation / Commissioning Necessary For The Implementation Of The Project: "Increasing The Energy Efficiency Of The Public Lighting Infrastructure In Tirgsoru Vechi Commune, Prahova County - Stage Ii"
Consolidation Works Related To The Investment Objective '' Seismic Consolidation And Increasing The Energy Efficiency For The Multi -Storey Building With The Main Dwelling Destination Located In Batiștei Str. 5, Sector 2, Bucharest ”
Purchase And Installation Of Mechanical And Electrical Equipment At Che Nehoiașu Ii, Extension Of 110 Kv Transformation Station
Execution Of The Replacement Works Of Pipes And Connections And Achievements Of New Natural Gas Distributions For Delgaz Grid S.A. 4 Lots
Execution Works For The Achievement Of The Investment Objective "Increasing The Energy Efficiency Of The Pneumophysiology Hospital Tudor Vladimirescu"
Electricity Storage System
Increased Energy Efficiency Of Public Buildings In Ialomița County - Uat Fetesti
Design, Technical Assistance From The Designer And Execution Works For The Investment Objective "Increasing The Energy Efficiency Of The Building The Administrative Palace"
Power Transformers_ Romania Electrical Readers
Hydrogen Cr 43731 Production Installation
Purchase Laboratory Kits For Smart Mobile Systems For The Artificial Intelligence Innovation Center Within The Project "Digitall@Tuiasi - Digital Transformation For The Professions Of The Future"
Purchase Ict Equipment For The Innovation Center In Advanced Digital Communications (Iot & 5G) Within The Project "Digital@Tuiasi - Digital Transformation For The Professions Of The Future"
Services For Monitoring Alarm And Intervention Systems In Emergency Situations At The Units Within The Distribution Of Electricity Romania Sa - Transilvania Nord Area And Transylvania Sud - (2 Lots)
Electricity
"Technical-Economic Expertise Setting Up Natural Gas Distribution Network In Prahova County- Cocorăștii Mislii, Vâlcănești, Cosminei, Dumbrăvești, Vărbilău, Aluniș, Ștefești, Benea And Slănic"
Repair Of The Natural Gas Transport Pipeline Dn1200 Isaccea-Negru Voda, Transit 2, Following The Inspection With Intelligent Pig, Tg_Rep_10027
Fully Equipped Prefabricated Transformation Stations, In The 2025 Concrete Tire (Ptab Station + Gater - Madaras, Harghita)
Execution Of Works To Achieve The Investment Objective: "Promoting Energy Efficiency And Reducing Greenhouse Gas Emissions Through Investments In Multifamilial Homes, In Baicoi, Prahova County"