Similar tenders from other countries.
Showing 1 to 20
Construction Monitoring Vv Bau Und Vv Bau Ste For Supplementary Measures Augsburg Hbf
14Tei10205 2. S-Bahn Master Route Munich-Pu 30 Shell Work Tunnel West With Trough And Hp Hauptbahnhof Bahnhofplatz
14Tei10205 2. S-Bahn Master Route Munich-Pu 30 Shell Work Tunnel West With Trough And Hp Hauptbahnhof Bahnhofplatz
F106: Fietsostrade Aarschot-Herentals Cluster 8: Wolfstee-Distelhof
14Tei10205 2. S-Bahn Master Route Munich-Pu 30 Shell Work Tunnel West With Trough And Hp Hauptbahnhof Bahnhofplatz
Consulting and technical assistance services for the monitoring and control of works on the construction project for reinforcing existing PPSS systems in the Mediterranean Corridor railway connection with the Madrid-Barcelona-French border high-speed rail line, between Vandellós and Tarragona, and the PPSS and tunnel adaptation project, installation of fall object detectors, and PPSS improvement on the L600 line (Valencia-Estació del Nord-La Boella interchange)
Mp -250027 N2 Restore First San Gottardo Tube - Voma Asbestsanierung Sisto
A Cool Water Tower Keeps It Safe.
Joint Project Arna - Stanghelle E01 Preparatory Works Road And Tunnel.
Ra Building And Construction Region North 2026 Ted
Tomajmonostorai Isk Infrastructure Development.
F106: Fietsostrade Aarschot-Herentals Cluster 8: Wolfstee-Distelhof
Tunnel Maintenance South-West; The Bergen Railway And The Sørland Railway With Side Railways
U2, Construction Section U2/22 "Rathaus" And Subway Line U5, Construction Phase U5/2 "Frankhplatz"
29 Day (S) 14 Hours (S) 50 Minute (S) 23 Second (S)
Construction Of An It System For Road Records Using E-Services
U2, Construction Section U2/22 "Rathaus" And Subway Line U5, Construction Phase U5/2 "Frankhplatz"
U2, Construction Section U2/22 "Rathaus" And Subway Line U5, Construction Phase U5/2 "Frankhplatz"
Ball Bores Tunnel
U2, Construction Section U2/22 "Rathaus" And Subway Line U5, Construction Phase U5/2 "Frankhplatz"