Similar tenders from other countries.
Showing 1 to 20
5010018273 Conception, Supply And Assembly Of The Automatic Speed Control System Etcs Level 1 To Emulate The Functionality Of The National Atpn/Convel System In Various Rfn Sections
Continuation Etcscorra Tp-Mi-Etcs Level 2 Oberlahnstein North And South
Modernization Of The Railway Station Jihlava Town
Santa Ana Level Passage Automation Work
Establishment Eow System Bf Zeitz
Ubf Augsburg - Gersthofen, New Construction Of An Eow System
Drafting Of The Constructive Project And The Execution Of The Necessary Works To Be Carried Out For The Renewal Of The Automatic Protection Of The Level Steps Located In The Pp.Kk 1/049 And 150/735 And The New Installation Of The Level Step Located In The P.K 132/443 Of The 200 Madrid Line - Chamartín - Barcelona - França Station
Drafting Of The Constructive Project And Execution Of The Works For The New Installation Of The Level Steps Located In The Pp.Kk. 56/802, 60/440 And 68/124 Of Line 512 Zafra - Huelva Cargas And The Level Steps Located In The Pp.Kk. 0/969, 6/306, 12/871 And 16/520 Of Line 514 Zafra - Jerez De Los Caballeros.
Design And Construction Of Signaling And Telecommunications Systems On The Plovdiv -Burgas Railway Under The Project "Rehabilitation Of The Plovdiv -Burgas Railway Line", Phase 2
Drafting Of The Constructive Project And The Execution Of The Necessary Works To Be Carried Out For The Renewal Of The Automatic Protection Of The Level Steps Located In The Pp.Kk 1/049 And 150/735 And The New Installation Of The Level Step Located In The P.K 132/443 Of The 200 Madrid Line - Chamartín - Barcelona - França Station
Drafting Of The Constructive Project And Execution Of The Works For The New Installation Of The Level Steps Located In The Pp.Kk. 56/802, 60/440 And 68/124 Of Line 512 Zafra - Huelva Cargas And The Level Steps Located In The Pp.Kk. 0/969, 6/306, 12/871 And 16/520 Of Line 514 Zafra - Jerez De Los Caballeros.
Tr 153223 - Industrial Signaling For Antwerp -Nord - Kanaaldok - Phases 2 And 3
Signaling Work Of The New Zumaia Garages
Nr (Hs) Control Systems
Reconstruction Of The Track Section Přibyslav - View
Modernization Of The Kladno Track (Incl.
Modernization Of The Kladno Track (Incl.
Reconstruction Of The Track Section Přibyslav - View
Modernization Of The Rakovník Railway Station
Signaling Work Of The New Zumaia Garages