Similar tenders from other countries.
Showing 1 to 20
A Batch Of Control Elements Such As Gas Turbines To Serve Thorium And Its Burn Pulse Detection Elements
Supply of Purchase request for spare parts for the fire-fighting system for fuel tanks Nos. (1 & 2) in the first phase of the combined cycle gas turbines at the Al-Zour South Station
Provision of Open cycle gas turbine generator synchronizers are required to be ordered and supplied to the electrical maintenance warehouses at the Subiya station.
Supply of Purchase request for operational spare parts for cooling towers and central water chillers in the first phase of the combined cycle gas turbines at Al-Zour South Station
Purchase Of Gas Turbines, Generators, And Auxiliary Equipment For Hadong Combined Cycle Power Plant (Re-Announcement, Correction Announcement)
Supplying the connecting shaft for the load gear for the F-5 gas units, number/2, for the Martyr Engineer Abdullah Hamza Ahmed gas power station
Rectification Works and Rewinding of Starting Motors and Auxiliary Motors for Frame 5 Gas Turbines at SHOASSKW Power Station, Lumut for One (1) Year
Rfq#2155371_Spares For Gas Turbines
Delivery Of Gas Internal Combustion Turbines With Accessories
Supply Of Lube Oil Coolers Tube Bundle & Gasket Set For V94.3A Gas Turbines At ‘K’ Station, Jebel Ali
Refurbishment of fixed and moving blades of V94.2 gas turbines of Shahid Sepahbad Soleimani combined cycle power plant in Kerman"
Services In The Area Of Energy Infrastructures Of The State Of North Rhine-Westphalia
supply of the Stub Shaft for the compressor side of the Martyr Engineer Abdullah Hamza Gas Power Plant
Supply of Spare parts for Cooling System at Control Building & Workshop for Combined Cycle Gas Turbines Stage One at Zour South Plant
Supply of Spare parts for Water Cooling System in Combined Cycle Gas Turbines Stage One at Zour South Plant
Repair And Repainting Services Of Air Intake Filter House Of Gtk51, Gtk52 And Gtk53 At ‘K’ Station Gas Turbines, Jebel Ali
Supply of spare parts for the non-return valves of the low-pressure system (HRSG) for the combined-cycle gas turbines, first phase, at Al-Zour South Station
Supply Of Pulse Type Self-Cleaning Inlet Air Filters For ‘D’ Station Re-Powering Gas Turbines, Jebel Ali
Purchase order for a non-return valve for the water cooling towers of the combined cycle gas turbines
Supply of Purchase order for cleaning ball circulation pumps inside the condenser tubes for steam units Nos. (50 & 60) in the first phase of the combined cycle gas turbines at the Al-Zour South Station