Similar tenders from other countries.
Showing 1 to 20
Increase In The Energy Efficiency Of A Cultural House In The Village Of Veľká Ves Nad Iplom
Elementary School With Kindergarten J. V. Dolinský In Martin - Increasing The Energy Efficiency Of The Building
Energy Efficiency Of Equipment Associated With The Operation Of The Ribeiro Conceição Theater Building
Supply And Installation For Connection Of Cemeteries To The Public Lighting Network Using Posts Equipped With Solar Lamps At Douars Jdid, Zriaat, Ait Aissa, Ouled Aliliche Commune Ouled Bouali Loued Province Of Elkelaa Of The Sraghna.
Integrated Renovation (Seismical Consolidation And Moderated Energy Renoome) And Moderate Or In -Depth Energy Renovation Of Multifamilial Residential Buildings/Housing Blocks In Sector 5 Of Bucharest - Design And Execution Of Works - Lot 1 And Lot 2
"Preparation Of An Investment Project In The Phase Of Working Project And Exercise Of Copyright Supervision During The Implementation Of Construction And Assembly Works For The Site:" Implementation Of Measures For Enhancing Energy Efficiency In A Building For Scientific And Design Activity - Block 11, Owned By Bas, Located In Sofia, "Akad. Georgi Bonchev", Science Complex
Resolution Of The General Directorate Of Rural Development, Innovation And Agrifood Training By Which The Relationship Of Assets And Rights Affected Is Submitted To Public Information, And Date Is Set For The Lifting Of Minutes Prior To The Occupation Of The Assets And Rights Necessary For The Realization Of The Works Related To The Project Of The "Works For The Improvement Of Water And Energy Efficiency In The Support Irrigation Of The Community Of Irrigators La Source (Valencia)." Sgrcnir File Number: 23.P30.
Specialized Services Commissioned By The Business Commission On Building Low-Carbon Materials Engineering And Energy Efficiency Improvement Field Application Certification Project
Klaus-Groth-Schule-New Building Sports Hall; Trade: Sports Floor
"Selection Of Contractor For Construction And Assembly Activities For The Construction Of Buildings For New Social Services And Specialized Social Service For Persons With Disabilities In Silistra Municipality" In Lots
Open Procedure, Pursuant To The R. 71 Of Legislative Decree N. 36/2023 And Ss.Mm.Ii., For The Assignment Of The Technical-Economic Feasibility Project, Including The Investigations Of In-Depth Analysis, Of The Executive Design As Well As The Coordination For Safety In The Design Phase, For The Intervention Aimed At Seismic Adaptation And Energy Efficiency, With Sustainability Criteria, De
Providing Equipment, Including Installation, Installation / Commissioning Necessary For The Implementation Of The Project: "Increasing The Energy Efficiency Of The Public Lighting Infrastructure In Tirgsoru Vechi Commune, Prahova County - Stage Ii"
Consolidation Works Related To The Investment Objective '' Seismic Consolidation And Increasing The Energy Efficiency For The Multi -Storey Building With The Main Dwelling Destination Located In Batiștei Str. 5, Sector 2, Bucharest ”
Basic And Execution Project Drafting Services, Coordination In Health And Safety During Project Development, The Management Of The Construction And Health And Health Coordination During The Execution Of The Works For The Improvement Of Energy Efficiency And The Reduction Of Greenhouse Gas Emissions In The Torrecárdenas University Hospital Of Almería. Cca: +6.C1Rmsy2 Cont 2024 0000691574 Exp. 0000510/2024
Works For The Improvement Of The Energy Efficiency Of The Avda Pio Xii 50 Building, Madrid.
Preparation Of An Investment Project In The "Working Project" Phase And The Exercise Of Copyright Supervision During The Implementation Of Construction And Assembly Works For The Site: "Implementation Of Measures For Enhancing Energy Efficiency In The Central Building Of The Physical Institutes Owned By Bas, 72 Tsarigradsko Shose Blvd.
Contract For Providing, Installing And Putting Into Operation Stereotactic Radiotherapy (Stereotaxie) For The Neurosurgery Clinical Section
"Preparation Of An Investment Project In The" Working Project "Phase And The Exercise Of Copyright Supervision During The Implementation Of Construction And Assembly Works For The Site:" Implementation Of Measures For Enhancing Energy Efficiency In A Building For Scientific And Design Activity - Block 9, Owned In The Bas Km.
Execution Works For The Achievement Of The Investment Objective "Increasing The Energy Efficiency Of The Pneumophysiology Hospital Tudor Vladimirescu"
Klaus-Groth School Neubau Sporthalle; Trade: Metal Construction Work