Execution Of The Segment Of The Social Pattern Sidewalk Śc 10/Ii/385, Linter Pavement Śc 9/Ii/385, Commas Śc 9/Ii/385 And Segment Of The Nadstyczno Pavement Śc 9/Ii/385 In The Bogdanka Field (Construction Works).
Design Documentation And Delivery Of 3D Standard Model For Weight Testing In The T-3 Aerodynamic Tunnel
Ar.631.7.Bj.25 "Nail Styling Course: Gel Completion- Correction Of Nails Growing Down And Tunnel Tips"
Performing The Function Of A Contract Engineer, Including Investor Supervision Over Construction Works Related To: A) Expansion Of Poviat Road No. 5607W - Al. Gen. A. Chruściela "Montera" Together With The Construction Of A Road Tunnel (.); B) Construction Of A Municipal Road - Ul. Bullet.
Development Of Project Documentation Together With Technical Support For The Project Entitled: "Construction Of A Long -Distance Tunnel In Łódź, Along Railway Line No. 85 Together With Inclusion In The Railway Line No. 14 - Section Branch Post Łódź Retkinia"
Maintenance Of Park Lighting Devices, Squares, Underground Passages, Tunnels And Monuments Located In Białystok
Development Of Project Documentation Together With Technical Support For The Project Entitled: "Construction Of A Long -Distance Tunnel In Łódź, Along Railway Line No. 85 Together With Inclusion In Railway Line No. 14
- Episode Branch Post, Łódź Retkinia "
Delivery And Installation Of A Medium Speed Recording Device In The Tunnel Near Zielonki Along National Road No. S52
Performing The Function Of A Contract Engineer, Including Investor Supervision Over Construction Works Related To: A) Expansion Of Poviat Road No. 5607W - Al. Gen. A. Chruściela "Montera" Together With The Construction Of A Road Tunnel (.); B) Construction Of A Municipal Road - Ul. Bullet.