Case 56/01915/2025 - Implementation Of Comprehensive Documentary Preparation And Performing Author'S Supervision For Investment Task No. 01915 Pn.
Execution Of Energy Characteristics Certificates For Buildings Or Part Of The Buildings Indicated By Amw Or In Olsztyn Within 12 Months.
Ki/171/2025 Development Of Design Documentation For The Hala Hala To Be Adjusted To Applicable Fire Regulations, Including The Adaptation Of The Paint Shop At The Borek Mpk Depot At Ul. Powstańców Śląskich 209 In Wrocław.
Dzp.271.75.2025.Eg Supply Of Ups Emergency Power Supply With A Set Of External Batteries With Assembly And Start -Up, As Well As The Implementation Of The Electrical And Connection Installation For The Building Of The Central Municipal Office In Elbląg At Ul. Communications 1 In Accordance With The Technical Project Entitled "Technical Design Of The Reserve Power Supply, Ups For The Building Of The Municipal Office In Elbląg At 1 Connectivity Ul.
Acts 270.52.2025 ,, A Consultancy Service In The Preparation Of Two Public Procurement Procedures, As Well As Expert Support In The Field Of Energy Efficiency And Design And Technical Documentation Of 7 Pilot Buildings Covered By Deep Thermo-Modernization, Until It Is Received Without Reservations "
Tzp-002/21Wm/Adm-1/2025 Implementation Of Design Documentation For The Reconstruction Of A Gas Installation In The Housing Community Building At Ul. Kazimierz Wielki 48-48A In Gorzów Wlkp.
Performing The Function Of A Contract Engineer At The Contract Entitled: "Expansion Of Voivodship Road No. 507 On The Pieniężno -Orneta Section".
Development Of A Comprehensive, Multi -Branch Design And Cost Documentation Together With Obtaining A Final Decision On The Permit For Construction Works And With The Service Of Performing Author'S Supervision As Part Of The Project Entitled: "Center For Music Education Of The Łódź Voivodeship"
Performing Works In The Formula "Design And Build" For The Task Entitled: "Reconstruction Of The Tram Track And The Traction Network In Sosnowiec Along Baczyńskiego Street From The Viaduct Over S-86 To The Milowice Loop" Task 11
1143568 Performing The Function Of An Investor Supervision Inspector Over The Implementation Of The Task Entitled "Sustainable Water And Sewage Management In The Łagiewniki Commune" In The Design Formula
Szp/243-180/2025 Delivery Of Motorized Optical And Digital Microscope As Part Of The Needs Of The Faculty Of Mechanical Engineering Of The Wrocław University Of Technology
Performing Engineering Supervision Over The Implementation Of The Srk Design Project And Comprehensive Construction Works On The Railway Line No. 622 On The Section F+J Podłęże R401 - Gdów / Podłęże R301 - Podłęże Balachówka As Part Of The Project Entitled: "Construction Of The New Railway Line Podłęże - Szczyrzyc - Tymbark / Mszana Dolna And Modernization Of The Existing Railway Line No. 104 Chabów - New - Stage Ii "
Performing Complete Design Documentation Together With Obtaining All Administrative Decisions Necessary To Carry Out Construction Works Carried Out In The Opole Forest District As Part Of The Project Entitled A Comprehensive Project Of Adaptation Of Forests And Forestry 71322000-1
Conservation Of Engineering Facilities.
Technical Supervision Over The Implementation Of The Investment Entitled "Design And Assembly Of Drainage Systems In Hurried Filters At The North Department In Wieliszew"
Delivery Of Titanium Alloy Rods For The Faculty Of Mechanical Engineering And Shipping Department Of The Gdańsk University Of Technology
Successive Delivery Of Experimental Feed (Full -Time Mixtures) For Poultry According To Methodology Of Experience For The Department Of Poultry And Beekeeping Of The Faculty Of Animal Bioengineering Of The University Of Warmia And Mazury In Olsztyn.
Development Of A Technical And Economic And Environmental Study Together With Materials For Issuing A Decision On Environmental Conditions For The Task "Construction Of The S8 Wrocław Road (Magnice)-Kłodzko, Episode Bardo Junction (Without A Knot)-Kłodzko Junction (With A Knot)"
Technical Supervision Over The Implementation Of The Investment Entitled "Design And Assembly Of Drainage Systems In Hurried Filters At The North Plant In Wieliszew.
Zp/Czd/080/25 "Modernization And Retrofitting Of Strategic Infrastructure At Ipczd- Laboratories In Buildings A, B, From The Institute Of" Monument- Children'S Health Center "In The Mode" Design And Build "Implemented As Part Of The Medical Fund"