Update Of Protection Plans For Landscape Parks: Mazowiecki And Nadbużański
22/Adm-3/2025/Wm Preparation Of Architectural And Construction Documentation For The Renovation Of The Entrance Stairs To The Building At Ul. Armii Polskiej 11 In Gorzów Wlkp.
D25M/252/N/39-77Rj/25 Providing Snow Removal Services, Spreading Sand And Permitted Chemicals, And Removing Ice From The Areas Of The Maritime Hospital. Polish Red Cross In Gdynia And The Area Of The Specialist Hospital. F. Ceynowy In Wejherowo
147/Bzp-U.510.128.2025.Mw Preparation Of Design Documentation And Author'S Supervision For The Tasks: Part No. 1 "Reconstruction Of Stairs Along Ciasna Street In Gdańsk" Part No. 2 "St. Wojciech Route - Construction Of Stairs, Ramps To The Niegowska 02 And Ukośna 02 Stops In Gdańsk" As Part Of The Sidewalk Construction And Modernization Program
Gki.271.42.2025 Preparation Of Draft Decisions On Development Conditions, Decisions On Determining The Location Of Public Purpose Investments And Giving Opinions On Changes To The Above. Decisions In The Sanok Commune
Preparation Of Design And Cost Estimate Documentation For The Reconstruction And Adaptation Of The Gos "Wysoki Kamień" To The Currently Applicable Regulations As Part Of Task No. 91743 Entitled "Expansion Of Gos Wysoki Kamień" And Execution Of Construction Works, Including Author'S Supervision, Obtaining An Occupancy Permit And Putting The Facility Into Use In Accordance With The Developed Documentation
Design And Construction Of Apartments At Ul. Kamienna In Piekary Śląskie - Stage I
Pm.271.1.78.2025 Design And Implementation Of A Mural On The Wall Of A Residential And Service Building At Ul. Żydowska 1 In Łęczyca
Rb.271.30.2025.Mp Construction Of A Warehouse Hall Stage I - Design Development
Ie.10.2025 Retrofitting The Existing Playground Belonging To The Public Nursery "Tuptusie" In Luzina
Acting As The Investor Supervision Coordinator For The Thermal Modernization Of The Building Of The Rybnik-Orzepowice Volunteer Fire Department, Ul. Total 62
Developed Construction And Design Documentation For The Construction Of The Temporary Animal Detention Center Of The Central Animal Asylum.
Providing The Service Of Acting As A Substitute Investor As Part Of The Investment Called "Comprehensive Execution Of Construction And Installation Works, Complete In Every Respect, In The Building Of The Headquarters Of Bank Gospodarstwa Krajowego At Aleje Jerozolimskie 7 In Warsaw"
Delivery, Installation And Launch Of An Accelerator For Online Adaptive Therapy Along With Adaptation Of The Rooms
Providing Services Of The General Contract Engineer For The Construction Of The Airport As Part Of The Central Communication Port Investment
Design And Construction Of The A2 Motorway From The "Biała Podlaska" Junction To The Gr. States; Section X From The "Biała Podlaska" Junction (Without The Junction) To Km Approx. 641+011
Development Of Complete Design Documentation Along With Obtaining The Necessary Administrative Decisions Enabling The Execution Of Works - As Part Of The Construction Of The Poland-Lithuania Gas Pipeline
Supervising The Design And Implementation Of The Works And Managing The Contract Entitled: "Design And Construction Of The Zwoleń Bypass Along National Road No. 79"
Preparation Of Full-Discipline Design Documentation For The Thermal Modernization Of Schools In The Jarocin Commune - Stage 2
Preparation Of Design Documentation For The Extension Of Provincial Road No. 620 From Km 0+000 To Km 7+337 (From The Intersection With Dw 632 In The Town Of Nowe Miasto Folwark To The Town Of Klukowo) And From Km 9+660 To Km 20+360 (From The Town Of Świercze To The Town Of Kęsy Wypychy).” - Procedure No. 214/25