Similar tenders from other countries.
Showing 1 to 20
Execution Of The Installation Works Of 15 Piezometers (In 13 Locations) In The Province Of Girona, Barcelona And Tarragona In The Tm Various, Within The Framework Of The Recovery, Transformation And Resilience Plan - Funded By The Eu - Next Generation Eu
Rainwater Treatment Saaler Str. A 302
Hiring Of A Specialized Company To Carry Out Administrative Management And Efficiency For Drilling Model Pg900S-200S Elgi Of The Municipality Of São Mamede/Pb. Including The Exchange Of Parts, Hand Of Work, Equipment Recovery For Its Operation, .
Upgrading Existing Water Gourgees Of Deya
These Actions Are Defined In Detail And Precision In The Corresponding Construction Project And Consist, Basically, In Executing The Units Of Work Necessary To Carry Out The Drilling And Equipment Of 15 Wells That Will Be Equated As Piezometers For The Monitoring Of The Water Masses In 13 Municipalities In Catalonia, In Order To Evaluate The Water Masses Properly From The Quantitative Point Of View.
Lovell Well Construction Project
Natops Pocket Checklists
Rft #Wwtc 2025-033 - Well 15 Replacement
Creation Of A Testing In Testing As Part Of The Implementation Of A Heat Network By Geothermal Energy On The Champ Libre Site In Pont-Marcq
Electrical Compliance Work Of The Museum Of Sens
Bi.271.141.2025.Mk Modernization Of Stefana Żeromskiego Street In Barczew Consisting In The Renovation Of The Bridgehead Of The Bridge Facility
Bi.271.141.2025.Mk Modernization Of Stefana Żeromskiego Street In Barczew Consisting In The Renovation Of The Bridgehead Of The Bridge Facility
Building A Water Pipeline Main Road 78 Under The Direction Of Drilling
"Proceptor Preparatory Works, Drilling And Production Tests At Exploration Wells"- 2 Lots Lot 1- Provisional Preparatory Works, Drilling And Production Tests At The Exploration Probe 76 Rosetti Lot 2 - Procepting Preparatory Works, Drilling And Production Tests At The Exploration Probe 54 Damianca.
Construction Services
Communicates The Mayor Of The Commune Of Guéré Communique, That The Ets Woum/ Ste Commerce Boubakary Harouna Sarl Group, Having Submissive For The Advice Of The Dao N'03 Of March 13, 2025 For The Work Of Constructing A Drilling Equipped With Pmh In The Locality Zarna (Lot 2) In The Commune Of Guéré For A Financial Offer Of 8,400.Oo The Outcome Of The Assessment Of The Offers And Therefore Is Assigned To The Said Notice. The Director Of The Ets Woum/ Ste Commerce Boubakary Harouna Sarl Group Is Asked To Present Himself To The Common Of Guéré As Soon As The Press Release Is Listened To For The Terms Of The Contractual Documents And
Restructuring And Extension Of The Center And Restaurant School Group - All Lots Except Outdoor Carpentry, Kitchen Equipment And Geothermal Drilling
A V I S D ’P P E L D’ O F F R É S National Open N ° 00000097/Aono/Minee/Cipm/2025 Of July 31, 2025 For The Construction Work Of Two (02) Positive Drilling Pumps For Human Motorcycle In Biamesse, Arrondissement Of Kiki, Department Of Mbam And Inoubou, Region Of The Center; For The Supply Of Drinking Water To Drilling The Solar Energy Pump Team Of The Village Balaveng-Bapi, Bafoussam Ii Arrondissement, The Mifi Department, West Region. In Two (02) Lots.
Service Of Drilling And Cement Solutions To Carry Out Work On Cutting The Side Barrel At The South Alamyshik Field
Technical Assistance To The Work Of Realization Of Piezometers And Recognition Of Groundwater By Drilling In The Pools Of Sakia El Hamra And Oued Eddahab