Similar tenders from other countries.
Showing 1 to 20
Reconstruction Of The Line Section Of Vlkov Near Tišnov (Outside) - Křižanov (Out)
Reconstruction Of The Line Section Of Vlkov Near Tišnov (Outside) - Křižanov (Out)
Designing And Performing Works For The Task Entitled "Improvement Of Safety At Selected Rail And Road Crossings In: I Bydgoszcz, Iz Łódź, I And Ostrów Wielkopolski, Iz Szczecin, Ia Warszawa, Iz Zielona Góra" As Part Of The Project Entitled "Improving Safety At Railroad Crossings - Stage Vii" Implemented As Part Of The National Plan Of Reconstruction And Increase Re Immorement (Kpo)
Santa Ana Level Passage Automation Work
Santa Ana Level Passage Automation Work
Reconstruction Of The Line Section Of Vlkov Near Tišnov (Outside) - Křižanov (Out)
Implementation Of The Measures Necessary To Operate The Ertms System On The Predeal-Bucharest-Constanța Railway Section And The Expansion Of The Gsm-R System On The Primary Railway Transport-Rail Signal Works For Ertms 2 Level And Railway Traffic Lot 2-Predeal-Buftea And Lot 3 Chitila Baneasa-Pantelimon-Lehliu-Fetești-Constanța
Reconstruction Of The Railway Station Brno - Královo Pole
"Current Repairs At Ccs -T Installations Within The Radius Of The Ct3 Adjud Section - Bla Installations On Borzeşti - Oneşti Distance
Signaling Work Of The New Zumaia Garages
Saming Work Of The New Zumaia Garages
Reconstruction Of The Railway Station Brno - Královo Pole
Signaling Work Of The New Zumaia Garages
Santa Ana Level Passage Automation Work
Drafting Of Constructive Project And Execution Of The Renewal Works Of The Security Facilities Of Line 400. Secipy-Córdoba Section
Santa Ana Level Passage Automation Work
9166 Design And Build Rail Systems Contractor For Dart+
Drafting Of Constructive Project And Execution Of The Renewal Works Of The Security Facilities Of Line 400. Secipy-Córdoba Section
Modernization Of Railway Passenger Infrastructure In Lines Krustpils - Rezekne (Vilani, Rezekne Ii), Krustpils - Daugavpils (Livani, Daugavpils): Construction (Design And Construction) ””
Implementation Of The Measures Necessary To Operate The Ertms System On The Predeal-Bucharest-Constanța Railway Section And The Expansion Of The Gsm-R System On The Primary Railway Transport-Rail Signal Works For Ertms 2 Level And Railway Traffic Lot 2-Predeal-Buftea And Lot 3 Chitila Baneasa-Pantelimon-Lehliu-Fetești-Constanța