Similar tenders from other countries.
Showing 1 to 20
25 Day (S) 16 Hours (S) 41 Minute (S) 56 Second (S)
Gói Thầu: Hybrid Solar Wind Power Generation System (Include Ac/Dc Inverter, And 24V Dc Distribution Boards; 400V Ac Switch Rack & Electrical Marshalling Cabinet, And Distribution Panels). Số Hiệu Gói Thầu: Dvn-Vt-2190/25-Xl-Da-Tth
Announcement On The Comparison Of The Ship Leasing Service Project Of The Beibu Gulf Wind Power Summer Full Tide Hydrological Observation In Ship Leasing Services
Changyuan Power Hubei New Energy Songzi Babao 100Mw Wind Farm Project Land Technical Consulting Service Public Tendering Project Tender Announcement
28--Dome,Special
28--Seal,Air,Aircraft G
Announcement Of The Dependency Of The Functional Area Of Industry And Energy Of The Government Subdelegation In Guadalajara, Which Is Submitted To Public Information The Application For Prior Administrative Authorization And Environmental Impact Declaration Of The Photovoltaic Plant Called "El Castillailla Solar", Of 80.16 Mw Of Installed Power, For Its Hybridization With The El Pivelada Wind Far Algora, In The Province Of Guadalajara. Expte. Peol-Fv-035.
28--Packing Ring Assemb
28--Adjusting Device
28--Filter System,Auxil
Guangdong Yuedian Zhuhai Offshore Wind Power Co., Ltd. In 2025
2025 Sihong Wind Power #07 Fan Replaced By One
2025 State Power Investment Group (Research and Application of Autonomous Control of Wind Turbine Main Control and Pitch Variable System of Shanwan Wind Farm of Northeast New Energy Company) Northeast New Energy Company Shanwan Wind Farm Wind Turbine Main Control and Pitch Variable System Localization Transformation Tender
28--Duct,Exhaust,Nonair
28--Shroud,Tailcone
28--Shroud,Tailcone
28--Dome,Special
Announcement Of The Industry And Energy Dependence Of The Government Subdelegation In Burgos And The Area Of Industry And Energy Of The Government Delegation In Cantabria, By Which The Application For The Declaration Of Environmental Impact And Prior Administrative Authorization Of The Installation Of The “Briesa” Wind Farm, 90 Mw Of Installed Power Is Submitted, Located In The Municipal Terms Of Espinosa De Los Monteros And Merindad Of Montija, In The Province Of Burgos, In The Province Of Burgos, In The Province Evacuation Infrastructure That Runs Through The Municipal Terms Of Espinosa De Los Monteros And Merindad De Sotoscueva, In The Province Of Burgos, And Vega De Pas, Villacarriedo, Saro, Santa María De Cayón, Penagos, Villaescusa And El Astillero, In The Province Of Cantabria; Promoted By The Mercantile «Tesera Energía 8, S.L.U.». Peol-973 Code.
28--Adapter,Drive
Kaji County High School'S 114 Wind And Rainball Field Power Improvement Project