Similar tenders from other countries.
Showing 1 to 20
Development Of Project Documentation And Execution Of Construction Works As Part Of The "Ertms Etcs System Development Level 1 Limited Supervision" Project
Santa Ana Level Passage Automation Work
Automation Work Of The Santa Ana Level Passage
Žsr, Electrification Of The Haniska Track - Veľká Ida - Moldava Nad Bodvou Town
Reconstruction Of The Track Section Žďár Nad Sázavou (Outside) - Sázava Near Žďár (Outside)
Execution Of The Works Of The Constructive Projects Of: - Civil Works For The Replacement Of Facilities And Services Located Outside The General Ferrroviary System (Sgf). - Cms For The Displacement Of Railway Security Facilities And Communications. Chamartín Scope.
Reconstruction Of The Track Section Žďár Nad Sázavou (Outside) - Sázava Near Žďár (Outside)
9096 Qualification System For Civil Engineering Works €50K To €1M
"Optimization Of The Track Od. Berounka (Incl.
Implementation Of The Measures Necessary To Operate The Ertms System On The Predeal-Bucharest-Constanța Railway Section And The Expansion Of The Gsm-R System On The Primary Railway Transport-Rail Signal Works For Ertms 2 Level And Railway Traffic Lot 2-Predeal-Buftea And Lot 3 Chitila Baneasa-Pantelimon-Lehliu-Fetești-Constanța
Drafting Of The Constructive Project And Execution Of The Works For The New Automatic Protection Installation Of The Class Step "A2" At The Kilometer 373/734 Of Line 160 Palencia - Santander, In The Municipality Of Alar Del Rey (Palencia).
Reconstruction Of The Track Section Žďár Nad Sázavou (Outside) - Sázava Near Žďár (Outside)
Santa Ana Level Passage Automation Work
Santa Ana Level Passage Automation Work
Implementation Of The Measures Necessary To Operate The Ertms System On The Predeal-Bucharest-Constanța Railway Section And The Expansion Of The Gsm-R System On The Primary Railway Transport-Rail Signal Works For Ertms 2 Level And Railway Traffic Lot 2-Predeal-Buftea And Lot 3 Chitila Baneasa-Pantelimon-Lehliu-Fetești-Constanța
Signaling Work Of The New Zumaia Garages
Saming Work Of The New Zumaia Garages
Signaling Work Of The New Zumaia Garages
Santa Ana Level Passage Automation Work
Drafting Of Constructive Project And Execution Of The Renewal Works Of The Security Facilities Of Line 400. Secipy-Córdoba Section