39--Jack Assembly,Stowa
16--Nrp,Control Wheel C
15--Cell,Fuel,Aircraft
Duct Assembly,Air C
Servovalve,Hydrauli
Beam,Aircraft
16--Gearbox Assembly,Ai
The Object Of The Contract Is To Replace The Sleeves On The Trains And In The Network Of The Network. More Specifically, This Competition Concerns The Main Line Of Line 1, The Trains And The Stasy Trains. The Physical Object Of The Project Includes The Allocation Of The Technical Personnel (Railway Technicians), Rail Equipment (Tools) To Carry Out The Following Tasks: - Replacement Of 300 Wooden Sleepers In Various Lengths, In Orbits And Changes Recorded And Will Be Indicated By The Service, - Drawing On All The Elements To Be Required (Rifles, Anchors, Springs, Plates, Etc.) For Replacement Work, - Removal Of Layer Of About 0.20-0.25M From The Level Of Soil To Remove The Layer Of Skyros Mixed With Soil Material, - Cleaning Skyros And Removing Soil Material, - Replacing The Sleepers In The Positions Of Change Or The Shift Of Those In Good Condition And Place Them In A Correct Arrangement, Giving Priority To The Points That The Service Will Indicate, - Creating Holes In New Sleepers, The Placement Of The Depressed Materials And The Strengthening Of All The Rail Connection Elements On The Sleeves (Helicopters, Washers, Spring Ring, Ligament, Tires, Etc.), Etc. - Completion With New Skyros (Where Required) And Undergoing The Railway Line, - Replacing Insulators Of The Power Bar (Materials Will Be Given By Stasy), - The Horizontal And Elevation Of The Railway Line.
Biennial Service Of Preventive And Corrective Maintenance Of The Cranes Installed On The Machines Of Via On The Barcelona-Vallés And Llobregat-Anoia Line Of The Ferrocarrils De La Generalitat De Catalunya. (Ref: Poss05/23)
Gearbox Assembly, Main
Pma-264 Air Anti-Submarine Warfare (Asw) Undersea Advantage (Usa) Block 1 (B1) Digital Directional Frequency Analysis And Recording (Difar) Vertical Line Array (Ddvla) Engineering & Manufacturing Development (Emd) Procurement
Transmission,Mechan
16--Drive Unit,Hydrauli, In Repair/Modification Of
Upgrade/Remanufacture Of The B-1B Actuator, Electronic - Mechanical
25--Hold Down Assembly,
Cable Assembly, Fiber
28--Blade,Turbine Rotor
49--Harness,Aircraft,Ma
31--Bushing,Sleeve
31--Bushing,Sleeve