13 Live Notices for Malaysia Water Treatment Tenders
Showing 1 to 13
Provision of INFRASTRUCTURE AND MECHANICAL EQUIPMENT REPAIR AND FLOOD REDUCTION AT UNIVERSITY OF MALAYSIA KELANTAN (UMK) CITY CAMPUS - PACKAGE 2: SUPPLY AND INSTALL PUMP SYSTEM AT UMK CITY CAMPUS
Provision of Replacement And Installation Of Latest PLC Telemetry And SCADA System At Sungai Tong 1 & Sungai Tong 2 Water Treatment Plant Including Communication Configuration Work Between PLC Stations And Other Related Work At Syarikat Air Terengganu Sdn. Bhd. Setiu District, Terengganu
Retender : Upgrading And Replacement Of Pipelines And Minor Improvement Works Refurbishment And Rehabilitation Works At Nanga Ngungun Water Treatment Plant, Sibu Division
Repair works and replacement of (2) two submersible pump units for water drainage tank in the basement of Miri Revenue Tower for the Inland Revenue Board of Malaysia Sarawak
COMPETENT ELECTRICAL VISITING ENGINEER SERVICES AT SOUTHERN REGION WATER TREATMENT PLANTS
COMPETENT ELECTRICAL VISITING ENGINEER AND SUPERVISOR SERVICES AT NORTHERN REGION WATER TREATMENT PLANTS AND DAMS
PBAPP 33KV Electrical Installation Inspection at Sungai Dua Water Treatment Plant and Pump House Maku Sulong by Competent Electrical Engineer for two (2) years (2025 - 2027)
Replacement of One (1) Unit Drive Speed Reducer Gear Motor At Ayer Itam Water Treatment Plant, Northeast Region, Pinang Island.
CLEANING SERVICES FOR INTAKE, CHAMBERS AND OTHER RELATED WORKS AT THREE (3) WATER TREATMENT PLANTS IN JOHOR BAHRU DISTRICT FOR A PERIOD OF TWO (2) YEARS
SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF CHEMICAL DOSING SYSTEMS AT SUNGAI JOHOR AND SEMANGAR WATER TREATMENT PLANTS FOR RANHILL SAJ SDN. BHD. i. TARIKH DIPELAWA
WORKS OF WASHING OF SEDIMENT TANK AND OTHER RELATED WORKS IN THE WATER TREATMENT PLANTS OF THE JASIN DISTRICT FOR A PERIOD OF TWO (2) YEARS
The Supply And Delivery Of Liquid Aluminium Sulphate For Jbalb Sarawak (Zone 1) Water Treatment Plants For A Period Of Two (2) Years (2025-2027) As And When Required Basis
The Supply And Delivery Of Liquid Aluminium Sulphate For Jbalb Sarawak (Zone 2) Water Treatment Plants For A Period Of Two (2) Years (2025-2027) As And When Required Basis