Similar tenders from other countries.
Showing 1 to 20
Building Bridge Over Cricovul Dulce River, Cristeasca Village, Cornesti Commune, Dambovita County And Access Road To The Bridge
Studies To Deviate From The Railway And Construction Of A New Bridge Between Touabaa And Matmata On The Fès-Oujda Line.
Quality Control Of The Construction Work Of The Track Connecting Chaouf Sghira And Chaouf Lkbira By Crossing Douar Aabou Kharbach About 3 Km From The Saada Territorial Commune To The Marrakech Prefecture.
Drinking Water Supply Work At Douar Ifrane (Idbazi) To The Commune Sidi Kaouki Province Of Essaouira
Quality Control Of The Reinforcement Work Of The Rr 322 Of The Pk 13+000 At Pk 17+200 Falling Under The Dpetl Of Mohammedia. Mohammedia Prefecture
Construction Work Of The Link Connecting Agdal To The Douar Tisakhte - Commune Of Zaouia Anahlia - Province Of Chichaoua -.
Replacement Market For Four Elevators And A Highway
Notice Of Intent – Sole Source – Pma 299 (Bridge)
Construction Contract For: Colombia Land Port Of Entry (Lpoe), Border Roadway Improvement & Construction (Bric)/Paving Project, Laredo, Tx
Z1Lb--626A4-26-203 Design Build (Db)-Main Entrance Traffic Improvements
Infr/580/2025 Construction Work Consisting In The Renovation Of Road And Pavements In The Military Complex At 28 Trzmielowicka Street In Wrocław
Tp.271.6.2025 Estimating The Value Of The Contract: Making A Program And Spatial Concept For The Construction Of A Road Viaduct Connecting Ul. Mieszko I And Ul. Kolejowa In Nowy Dwór Mazowiecki, Along With The Replacement Of The Railway Crossing In A Kilometer Of 43,600 Railway Line No. 9 Of The Two -Level Intersection.
Rn320 - Oa2 Repair Work On Ariège.
Korvenkylä 4Th Phase Streets, Environment And Water Supply Construction
R49 4901 Hulin - Fryšták
Protection Work Against Rocky Landslides And Repair Work For Art Structures
R49 4901 Hulin - Fryšták
Procedure Package 03.03 High-Road System, Helmut-Kohl-Allee (Hka), Ludwigshafen, North Area, Dismantling Cube Bunker And Surrounding Buildings
25-096205 Bruecke Work
Free The Bridge Cone 4Th Quarter 2025