Prime Contractor Engineering (Moei) Of The Project To Build A Indoor Swimming Pool In The Socio-Sporting Space "El Msalla" At The District Of Sidi Bernoussi.
Provision of technical studies and monitoring of expansion works for the Boukhlouf unit (Sidi Ayad)
Provision of geotechnical studies and monitoring of the construction of Sidi Ayad Middle School
Provision of geotechnical studies and monitoring of expansion works for the Boukhlouf unit (Sidi Ayad)
Geotechnical Studies And Control Of Construction And Project Development Work In The Commune Of Aknoul - Province Of Taza
Geotechnical Study, Reception Of Excavation Funds And Quality Control Of The Construction Work Of The Center Of Urban Health Level 1 (Csu1) Bhalil To The Province Of Sefrou
Technical study and monitoring of fence repair and rehabilitation works at Omar Ibn Al-Khattab High School in the Meknes community, Azroufen School in the Sidi Slimane Moul El Kiffan community, and health facilities at Anassi 2 School in the Meknes community, Meknes prefecture.
Technical study and monitoring of the expansion works of the Mohamed Zerktouni schools in the Meknes commune and Arab Sabah in the Mahaya commune - Meknes prefecture
Technical study and monitoring of the expansion works of the Ahmed Ben Chekroun middle school in the Oued El Jadida commune - Meknes prefecture
Technical study and monitoring of the expansion works of the Khnata Bennouna school in the Meknes commune - Meknes prefecture.
Technical study and monitoring of the construction of the administration works at the schools of Ben Jaber El Meknassi, Mohamed Zefzaf, and Ahmed Amin in the Meknes commune, Naiji in the Majjat El Ghiwa commune in the Ain Karma commune, and Hajj Kadour in the Sidi Slimane Moul El Kiffan commune - Meknes prefecture.
Assistance To Project Management (Amoa) And Project Management Office (Pmo) For The Implementation Of The Monitoring And Reporting System
The Assistance And Support Of Sntl To The Project Management Relating To The Project Of The Implementation Of Analytical Accounts.
Geotechnical Study Of The Level Of Service Of The Rn6 Of The Pk 498+000 At Pk 528+000 -Prefecture Of Oujda Angad-
Provision for Completion of detailed preliminary studies (APD) and contracting consultation files (DCE) for the liquid sanitation network, technical assistance, and monitoring of liquid sanitation works at the Ouled Knaou Center in the Beni Mellal Province
Provision of Carrying out detailed studies of rainwater harvesting projects within the jurisdiction of the Tensift Water Basin Agency
Provision of Carrying out hydrological measurement campaigns and completing presses within the jurisdiction of the Tensift Water Basin Agency
Geotechnical Study, Reception Of Excavation Funds And Control Of The Construction Work Of The Seat Of The Provincial Management Of Equipment And Water From Marrakech
Program for the development of infrastructure for the reception, storage, regasification and transport of natural gas and gas-fired power plants
DEVELOPMENT OF A PILOT & VTS SIMULATOR IN SECTOR 6 OF THE TMPC AT THE TANGER MED PORT