12 Live Notices for Middle East Gas Turbines Tenders
Showing 1 to 12
supply of the Stub Shaft for the compressor side of the Martyr Engineer Abdullah Hamza Gas Power Plant
Supply of Spare parts for Cooling System at Control Building & Workshop for Combined Cycle Gas Turbines Stage One at Zour South Plant
Supply of Spare parts for Water Cooling System in Combined Cycle Gas Turbines Stage One at Zour South Plant
Repair And Repainting Services Of Air Intake Filter House Of Gtk51, Gtk52 And Gtk53 At ‘K’ Station Gas Turbines, Jebel Ali
Implementation of three Shelter sets for ED and F gas turbines of methanol power plant
Supply of spare parts for the non-return valves of the low-pressure system (HRSG) for the combined-cycle gas turbines, first phase, at Al-Zour South Station
Supply Of Pulse Type Self-Cleaning Inlet Air Filters For ‘D’ Station Re-Powering Gas Turbines, Jebel Ali
Outsourcing / Hiring Of Scaffolding Services Including Scaffolding Material For Gas Turbines And Bop At Japs & ‘H’ Station In Generation Division
Purchase order for a non-return valve for the water cooling towers of the combined cycle gas turbines
Supply of Purchase order for cleaning ball circulation pumps inside the condenser tubes for steam units Nos. (50 & 60) in the first phase of the combined cycle gas turbines at the Al-Zour South Station
Provision Of Refurbishment Services And Osm Upgrade For Phase 3 Power Plant
Spare parts for the chemical injection system for the combined cycle gas turbines, phase 1, at Al-Zour South Station