Similar tenders from other countries.
Showing 1 to 20
Announcement Of The Industry And Energy Area Of The Government Delegation In Extremadura, By Which The Application For Prior Administrative Authorization And Administrative Authorization Of Construction For The La Fernandina Storage Module, 24.04 Mw, Is Submitted To Public Information, For Its Hybridization With The Existing Photovoltaic Plant La Fernandina, Of 49.99 Mw Of Installed Power, And Its Evacuation Infrastructure. Mérida (Badajoz).
Renovation Work Of Heating Installations With Installation Of Geothermal Heat Production Aniche And Cambrai
Engineering Services For Planning, Construction Monitoring And Commissioning A Heat Pump At The Run -Out Of The Sewage Treatment Plant In Würzburg
Dlr Location Zittau, Gi Neubau Bürogeb. Experimental Hall Di, Sanitary Technology (25-0123_B)
Provision for Development of Upper Chameliya hpp (53.85 mW), DarChUla DistriCt on a BUilD-oWn-operate-transfer (Boot) moDel
Provision for Development of hydro power project in boot model
Provision for Development of hydro power project
Announcement On The Bidding Project Of Guangdong Company'S Taishan Power Plant Network Shield Safety Integrated Protection Application Construction
Performance Of The Conceptual And Executive Design
Construction Work Of 2 Photovoltaic Power Plants On The Ground -Vivonne 2261-2262
Announcement By Which The Request For Modification Of The Prior Administrative Authorization, The Administrative Authorization Of Construction And The Public Utility Declaration Of The Solar Park Called Ebro Of 1.86 Mwp Of Power Installed On Land On Non -Urbanizable Land, In The Municipality Of Móra D'Ebre In The Region Of The D’Ebre Ribera And Its Evacuation Infrastructure, Soterrad Lines, Soterraded Lines, Soterrad Lines, Soterrad Lines, Soterrad Lines, Soterrad Lines, In 25 Kv That Will Connect To A New Cell To Be Installed In The Current Ct-104464, Owned By Edistribuccion Digital Networks, Slu., In The Municipality Of Móra D'Ebre, In The Region Of The Ribera D’Ebre (File Of The Modification: Fue-2025-04357184; File Of The Authorization Of The Plant: Fue-2021-021-0198128; Reference: Ripre-02570).
Modernization Of The Aeration System Of The Nitrification Of Technology Block Nitrification At The Sewage Treatment Plant In Radomsko
Bam Tts Horstwalde, New Building Pf Printing Vessels And Gas Storage, Compressed Air System
Former Hkw Dresden-Mitte, Kwm 30, Switchgear; Pu 200 Roof Work
Design Services, Technical Assistance From The Designer And The Execution Of The Works For The Achievement Of The Investment Objective «New Capacities For The Production Of Electricity From Renewable Sources For Self -Consumption At The Student Campus" Tudor Vladimirescu ", Which Belongs To The Technical University" Gheorghe Asachi ""
Construction Of Furniture Buildings
Seomyeon Dori Sun Solar Power Plant And Ppa 300Kw Linkage Construction Supervision Service
Construction Work Of 2 Photovoltaic Power Plants On The Ground -Vivonne 2261-2262
New Construction Of A Low Field In Nuremberg
2025 Mengneng Power Construction Junda Power Plant Angle Steel