This Market Consists Of All The Work Allowing The Dismantling Of Existing Behaviors And Existing Pressure Regulation Equipment, As Well As The Reassembly Of New Stainless Steel Pipes And Regulation Equipment In The Technical Premises. An Upgrading Of Pressure Regulation Equipment In The Tunnel Galleries Is Also Part Of This Market. In Order Not To Disturb The Exploitation Of The Tunnel During These Works, A Provisional Water Pipe In The Technical Premises Will Be Installed In Order To Guarantee The Food For Extinction In The Tunnel At All Times.
5252 - External Developments Work - Production Of The Ditches For Evacuation Of Rainwater To The Project Retention Basins 5252 "Wunne Mat Der Wooltz" In Wiltz Quarter Q2
Modernization And Enlargement Of The Uebersyren Treatment Station - 3Rd Phase - Realization Of The Water Treatment Route (Electromechanical Equipment)
Mechanical And Electrical Engineering Equipment For The Following Parts Of The Treatment Plant: - Provisional Pumping Station With Tumbler - Degreaser With Degreaser - Primary Decanation Pool With Scraper - Aeeration Pool With Overpressure Station - Secondary Decanation Pool With Scraper - Storage Pool For Defrosting Water - Pumping Station For Excess Mud And Recirculalation Pond -
5252 - External Developments Work - Production Of The Ditches For Evacuation Of Rainwater To The Project Retention Basins 5252 "Wunne Mat Der Wooltz" In Wiltz Quarter Q2
The City Of Esch-Sur-Alzette Wishes To Requalify The Developments Of Rue Winston Churchill. As Part Of This Submission, It Is Planned To Deposit The Existing Road Trunk And Carry Out A New Leveling In Order To Create A Shared Space, Commonly Called "Shared Space", In Front Of The Woblécken School. This Requalification Work Will Be Carried Out In Two Phases, The First Of Which Is The Subject Of This Submission. Low -Scale Interventions On The Pipes Are Also Planned, Such As The Replacement Of Siphons And Linear Gutters, Made Necessary By The Change In Leveling. The Work Also Includes Requalification Or Partial Strengthening Of The Following Dealers' Networks: • Sudstroum; • The Collective Antenna; • Public Lighting (Partially); • Water Pipe, The Installation Of Which Will Be Provided By The Municipality. Beginning / Duration Of Work: October 2025/150 Working Days
Redevelopment Work On Rue De La Montée, Rue Des Prés, Rue Du Cimetière And Rue Du Luxembourg In Leudelange And Reconstruction Of Mixed And Rainwater Pipes, Drinking Water Pipes And The Creos Network.
Chem Uplps- Tender: Heating, Climate, Ventilation And Sanitary Installations
Heating Work - Air Conditioning - Ventilation - Heat Recovery From Wastewater, Air Compressors And Electric Premises - 4 250Kw Heat Pumps - 40 Pumps, 21 Heat Exchangers - 20 Air Conditioning Cabinets - 14 Double Flow Ventilation Plants - Aerale Networks While Stainless Steel Stainless Steel
Large Of The Work: - Pp Pipes In Pp Dn400 Sn12: 90 Ml - Dn125 Ducts: 1,100 Ml - Dn100 Water Pipe: 120 Ml - Trench Earthworks: 280 M3 Start Of Work: 25/08/25 Duration Of Work: 40 Jo
Technical Installation Works "Hvac - Sanitarians - Sprinkge" To Be Executed In The Interest Of The Construction Of The Social Security City - Phase Ii, 2 Rue Mercier, L -2985 Luxembourg. This Call For Tenders Includes, Among Other Things, The Following Work:- Hvac Part: +/- 45 Radiators, +/- 115 Flooring Conveners In A Gutter, +/- 1.085 M2 Heating-Ground, Heating Distribution +/- 19.500 M, 2 Refrigeration Machines, 2 Cooling Laps, Cold Distribution +/- 19.500 M, +/- 1,200 Reversible Islets, 11 Exchange, 1 Co Ventilation For Parking, 1 Installation Drive In Case Of Smoke Extraction- Sanitary Part: Evacuations Of Wastewater And Rainfall +/- 4,500 M, Distribution Of Cold And Hot Water +/- 4.100 M, 1 Production Of Domestic Hot Water, +/- 270 Sanitary And Accessories Equipment, 1 Overpressure Installation For Ria- Sprinkler Part: 6 Control Stations, 1 Sprinkler Network (+/- 4.800 Heads And +/- 17.500 M Piping)
Purpose Of The Work: Development Of A Shared-Space In The Rue De L'Eglise And Rue Du Fossé Without Differences In Levels Between The Roadway And The Sidewalk With Renewal Of Various Networks. Succinte -Market Description - Civil Engineering Work Earthworks (Roads + Trenches): 7,600M3 Embankments (Roads + Trenches): 7,600M3 Dallage 30X60Cm: 2,750.00 M² Slabs: 520.00M Colorful Coated: 180 To Cornières For Bins Planted In Corten Steel: 320M Pipeline (Wastewater And Rainwater): 720M Water Driving Work: 520M Various Network Work Start/Duration Of Work: September 2025/400 Working Days
The Project Includes: - The Redevelopment Of The Pavement Trunk And Improving Adhesion; - Enlargement And Strengthening Of Shoulders; - The Implementation Of Reservoir Devices; - The Elimination Of Low Walls On The Edge Of The Dangerous Road; - The Distance From The Canettes Of The Road According To The Availability
Notice Of Planned Sole Source Award - Jdam & Sdb