Scope Of Work: Dry Structures: Metal Frame Partitions 1,700 M2 Fire-Rated Metal Frame Partitions 700 M2 Lining Of Wooden Panels With Plasterboard 810 M2 Counter Fire-Rated Partitions 1,900 M2 Sanitary Installation Partitions 520 M2 False Ceilings: Plasterboard 580 M2 Fire-Rated Plasterboard 1,180 M2 Acoustic Plasterboard 490 M2 Doors: Wooden/Glass Doors 110 Pcs Wood/Glass Fire-Rated Doors 53 Pcs Fire-Rated Steel Doors 16 Pcs Sliding Doors 9 Pcs Sanitary Partition Systems: 62 Pcs Mobile Walls | Mobile Partitions: 2 Pcs Vertical Cladding: Wooden Acoustic Panels With Oak Slat Structure 450 M2 Wall Cladding In Oak Panels 103 M2 Sports Room Cladding In Fir Wood With Slat Structure 165 M2 Horizontal Cladding: Wooden Acoustic Panels With Fir Slat Structure 280 Ml Wood Fiber Acoustic Panels 35 M2 Acoustic Panel Suspended In Glass Wool, Baffles 5.120 Ml
5251 - Epoxy Floor Covering Work On A Smooth Paving - "Wunne Mat Der Wooltz" Q2 - Lot 7 - Multifunctional Building In Wiltz
Metal Interior Joinery Work To Be Carried Out On Behalf Of Servior As Part Of The Project To Build The New House Of The Elders At L-3743 Rumelange. The Works Consist As Follows: - Metal Interior Doors, Standard And Fire Cutting, With Variable Finies - Interior Doors Of Water -Repellent Professional Storage In Pehd - Fire -Cutting Curtains - All Accessories, Hardware And Locksmith Relating To Each Type Of Door
Provision Of Aircraft Cargo Nets And Slings
Loading And Tiling Work - Cement Screeds: +/- 1060 M2 - Anhydrite Caps (Calcium Sulfate): +/- 1500 M2 - Waterproofing Under Tiles: +/- 1060 M2 - Floor Tiles: +/- 1120 M2 - Wall Tiles: +/- 620 M2 Foreseeable Start Of Work: July 2026 Predictable Duration Of Work: 115
Prefabricated And Non -Carrier Prefabricated Wood Framework, (10 M3 Solid Wood And Approximately 2,300 M2 Of Wood With Multiple Boxes); Metal Framework Carriers Carrier And Non -Carrying, (Approximately 230 Tb Of Steels); Accessible Flat Roof Cover And Terraces Roofs, With Extensive Vegetation (About 1,1800 M2); Aluminum, Steel, Aluminum And Stainless Steel Façades In Curtain Wall, Wood Aluminum. (About 1,000 M2); Prefabricated Facades Work (Around 4,600 M2); Stores Outdoor Blinds With Motorized Strips. (Approximately 870 Pcs); Isolated Facades Work Clad With Wood And Metallic Siding. (About 5,800 M2); Scaffolding Work, Implementation Of Temporary Closings And Protections And Safety Devices. The Duration Of The Work Is 471 Working Days, To Start In Early 2026. The Work Is Sold At Unit Prices.
Supply Of Red Hat Licenses For The It Infrastructure Of The Grand-Ducal Police From 2026 To 2028
Supply Of Red Hat Licenses For The It Infrastructure Of The Grand-Ducal Police From 2026 To 2028
Lot Works 07: "Elevators" To Be Carried Out In The Interest Of The Construction Of The Social Security City - Phase Ii, 2 Rue Mercier, L -2985 Luxembourg This Call For Tenders Includes, Among Other Things, The Following Work: - 3 Elevators -Duplex, Including Dressing Of The Beades Faces - 1 Accompanied Ride, Including
Provision Of Track Shoe,Vehicular
The Start Of Studies And Business Workshop Plan Is Scheduled For February 2026. The Start Of On -Site Work Is Scheduled For July 2026 The Overall Duration Of The Work Is 237 Working Days For The Work (In Phases). Large Of The Work: Exchange: +/- 4025 M2 Wall In Wood Structure: +/- 1655 M2 Metal Cladding: +/- 3000 M2 Wall Outside Curtain: +/- 1400 M2
Cls For Tents Operations And Maintenance
Various Holsters For Pistols (Glock 17 And Glock19)
Track Shoe,Vehicular For Mlrs
Notification Of Planned Sole Source Award For The Provision Of Coveralls, .