Electromechanical Work -1 Lighting -2 Pumps -4 Anti -Crue Pumps -2 Cave Empty Pump -1 Adjustment Valves And 2 Flowmers -1 Outdoor Electrical Cabinet -Interior Interior
Technical Installation Works In General Partial Business Include The Work Of Low -Voltage Electrical Installations, Low Current And Renita, Hvac And Sanitary Facilities Work, Work In Production In Production. The Duration Of The Work Is 381 Working Days, To Start Around 2025. The Work Is Sold At Unit Prices.
2571-Painting Work-Construction Of 2 Residences At 6 Units, 1 And 3 Ops From Quärten To L-3961 Ehlange-Sur-Mess
New Logistics Center Of Rail Infrastructure In Bettembourg/Dudelange Depollution Works, Earthworks, Lumping And Deep Foundations
New Logistics Center For Rail Infrastructure In Bettembourg/Dudelange Fatrmed Works Closed And Infrastructure
Metal Framework
External Development Work And Landscaping
Earthworks, Renewal, Transformation And Clogging Work Of The Source "Lampicht", Located Between Beyren And Mensdorf, On Behalf Of The Municipal Administration Of Flaxweiler
This Market Consists Of All The Work Allowing The Dismantling Of Existing Behaviors And Existing Pressure Regulation Equipment, As Well As The Reassembly Of New Stainless Steel Pipes And Regulation Equipment In The Technical Premises. An Upgrading Of Pressure Regulation Equipment In The Tunnel Galleries Is Also Part Of This Market. In Order Not To Disturb The Exploitation Of The Tunnel During These Works, A Provisional Water Pipe In The Technical Premises Will Be Installed In Order To Guarantee The Food For Extinction In The Tunnel At All Times.
Call For Expression Of Interest To Select Financial Intermediaries That Will Receive Resources From The Holding Fund Lithuania 2021-2027
Supply Of Spare Parts For Awacs Fleet
Installation And Operation Of A Heating Power Plant (Pellets) With Heat Network As Well As Heat Supply Over A Period Of 20 Years.
Acquisition Of A Automated High Throughput Hybrid Brightfield And Fluorescence Slide Scanner For Lih Pathology Platform
Modernization And Enlargement Of The Uebersyren Treatment Station - 3Rd Phase - Realization Of The Water Treatment Route (Electromechanical Equipment)
2571-Interior Coatings And Ceiling Work-Construction Of 2 Residences At 6 Units, 1 And 3 Ops From Quärten To L-3961 Ehlange-Sur-Mess
Transformation Of The Ancienne Town Hall Of Manternach Into A Crèche With A Power Plant And An Urban Heating Network And Construction Of A Public Outdoor Parking
2571-Interior Coatings And Ceiling Work-Construction Of 2 Residences At 6 Units, 1 And 3 Ops From Quärten To L-3961 Ehlange-Sur-Mess
Collection And Transport Of The Deches Of The Municipalities Member Of The Sycosal
2571-Chappes And Tile Work-Construction Of 2 Residences At 6 Units, 1 And 3 Ops From Quärten To L-3961 Ehlange-Sur-Mess
2571-Chappes And Tile Work-Construction Of 2 Residences At 6 Units, 1 And 3 Ops From Quärten To L-3961 Ehlange-Sur-Mess