Enlargement Of The A3 Motorway To The Law Of The Livange Interchange With The Construction Of Four New Straps For The Livange Interchange As Well As The Demolition And Reconstruction Of The Work Oa1020. The Work Consists In Particular In The Realization Of: - Enlargement Of The A3 Motorway With The Construction Of The New Livange Interchange Composed Of Four New Suspenders - Demolition And Reconstruction Of The Work Oa1020 In Phases - Construction Of Provisional Abutments For The Establishment Of A Provisional Work During The Reconstruction Of The New Work Oa1020 - Rehabilitation Of The Work Oa1021 - Deviation Or Protection Of Existing Networks And New Networks - Construction Of An Open Retention Basin - Renewal Of The Bond Layer And The Rolling Layer On The Entire A3 Motorway Within The Limits Of The Project And On A Part Of The Project Limits - Recovery Of The N31 And Agricultural Paths - Construction Of Acoustic Screens - Installation Of Signal Lights On The N31 Crossroads Of The New Executive Executive Exchange: Prepictable Work: Fall 2025
Rehabilitation Of The Oa1242 "Rue De La Grotte" Spanning Syre In Betzdorf On Cr145 It Consists Of A Single Opening Span Equal To 1 0.48Ml. The Work Of Art Spans The Syre And Carries The Cr145. The Sidewalks Are Made Up Of Borders, A Line Of Paving Stone In Granite, A Bituminous Coating, Concrete Cornices And A Railings. The Book Has 4 Avallitates Placed In Its 4 Corners. Hat Aerators Are Placed Under The Sidewalks, They Cross The Cantilevered. The Bridge Is Based On Eight Supports Which Themselves Are Placed On Concrete Bosses. The Experiences Have A Chute Over Their Entire Length. The Evacuation Of The Waters Is Done Through Barbaccoans Who Throw Themselves Into The Watercourse. Trappes Of Networks Are On Both Sides Of The Work, On The Downstream Side.
The Mechanism Chosen Is That Of An Open And Non-Selective System Which Does Not Grant Any Exclusivity To Industrialists, Which Must Respect The Conditions Of The Dsr. All Industrialists Fulfilling The Conditions Defined By The Open And Non -Selective Seo System Can Enter The System For Its Entire Duration. The Open And Non-Selective Seo System Is Neither The 2014/24/Eu Directive Of The European Parliament And The Council Of February 26, 2014 On The Publication Of Public Markets, Nor The 2014/25/Eu Directive Of The European Parliament And The Council Of February 26, 2014 Relating To The Passing Of Markets By Entities Operating In The Water, Energy, Transport And Postal Sectors, 2024/24/Eu Of The European Parliament And The Council Of February 26, 2014 On The Allocation Of Concession Contracts. In Addition, The Open And Non-Selective Seo System Does Not Fall Under The Modified Law Of April 8, 2018 On Public Procurement, Nor The Modified Law Of July 3, 2018 On The Award Of Concession Contracts. Consequently, This Notice Does Not Constitute A "Market Opinion" Or A "Notice Of Concession".
Flexible Floor Work To Be Carried Out On Behalf Of Servior As Part Of The Project To Build The New House Of The Elders At L-3743 Rumelange. Large Work: - Rubber Flooring: Approx. 6,000 M2 - Floor Covering In Carpet: Approx. 270 M2
Rehabilitation Of The Oa1242 "Rue De La Grotte" Spanning Syre In Betzdorf On Cr145 It Consists Of A Single Opening Span Equal To 1 0.48Ml. The Work Of Art Spans The Syre And Carries The Cr145. The Sidewalks Are Made Up Of Borders, A Line Of Paving Stone In Granite, A Bituminous Coating, Concrete Cornices And A Railings. The Book Has 4 Avallitates Placed In Its 4 Corners. Hat Aerators Are Placed Under The Sidewalks, They Cross The Cantilevered. The Bridge Is Based On Eight Supports Which Themselves Are Placed On Concrete Bosses. The Experiences Have A Chute Over Their Entire Length. The Evacuation Of The Waters Is Done Through Barbaccoans Who Throw Themselves Into The Watercourse. Trappes Of Networks Are On Both Sides Of The Work, On The Downstream Side.
Supply Of Wheel And Tire Asse For Sh60F
Enlargement Of The A3 Motorway To The Law Of The Livange Interchange With The Construction Of Four New Straps For The Livange Interchange As Well As The Demolition And Reconstruction Of The Work Oa1020. The Work Consists In Particular In The Realization Of: - Enlargement Of The A3 Motorway With The Construction Of The New Livange Interchange Composed Of Four New Suspenders - Demolition And Reconstruction Of The Work Oa1020 In Phases - Construction Of Provisional Abutments For The Establishment Of A Provisional Work During The Reconstruction Of The New Work Oa1020 - Rehabilitation Of The Work Oa1021 - Deviation Or Protection Of Existing Networks And New Networks - Construction Of An Open Retention Basin - Renewal Of The Bond Layer And The Rolling Layer On The Entire A3 Motorway Within The Limits Of The Project And On A Part Of The Project Limits - Recovery Of The N31 And Agricultural Paths - Construction Of Acoustic Screens - Installation Of Signal Lights On The N31 Crossroads Of The New Executive Executive Exchange: Prepictable Work: Fall 2025
Work Comprising: - The Supply, Installation And Commissioning Of Hvac Installations Of Urban Heat Networks In The Q5 District, - The Supply, Installation And Commissioning Of Electrical Installations Relating To Urban Heat Networks In The Q5 District (Including The Entire Electrical Installation Of Lt Ice Tank) And Photovoltaic Installations Of Lots Constructions.
The Mechanism Chosen Is That Of An Open And Non-Selective System Which Does Not Grant Any Exclusivity To Industrialists, Which Must Respect The Conditions Of The Dsr. All Industrialists Fulfilling The Conditions Defined By The Open And Non -Selective Seo System Can Enter The System For Its Entire Duration. The Open And Non-Selective Seo System Is Neither The 2014/24/Eu Directive Of The European Parliament And The Council Of February 26, 2014 On The Publication Of Public Markets, Nor The 2014/25/Eu Directive Of The European Parliament And The Council Of February 26, 2014 Relating To The Passing Of Markets By Entities Operating In The Water, Energy, Transport And Postal Sectors, 2024/24/Eu Of The European Parliament And The Council Of February 26, 2014 On The Allocation Of Concession Contracts. In Addition, The Open And Non-Selective Seo System Does Not Fall Under The Modified Law Of April 8, 2018 On Public Procurement, Nor The Modified Law Of July 3, 2018 On The Award Of Concession Contracts. Consequently, This Notice Does Not Constitute A "Market Opinion" Or A "Notice Of Concession".