Acquisition Of A Automated High Throughput Hybrid Brightfield And Fluorescence Slide Scanner For Lih Pathology Platform
Installation Work Of A Transformer Position In The Interest Of Rehabilitation Of The Conteerstuff In Contern: - Prefabricated Mt Post, Dimensions: 7.1 M X 2.8 M X 3.1 M - Middle Voltage Cell: Bouclage / Sectioning And Mt Counting Measurement - Three -Phase Transformer Dry Type 400Kva - Tgbt + Photovoltaic, 8 Cells - Tables - Tables - Tables - Wiring And Journey - Earth Network And Equipotential, 100M 1X95Mm² - All Accessories Beginning Of The Work: September 2025 Duration Of The Work: 70 Working Days (In Several Phases)
Acquisition Of A Automated High Throughput Hybrid Brightfield And Fluorescence Slide Scanner For Lih Pathology Platform
Recharge And Reprofing Of A Adjoining Rural Path (Out Of 1110 M ') To The Locals: "Beim Keizenbour-Im Kitzebour" In Christnach/Medernach On The Territory Of Waldbillig Municipalities And Ernz Valley Large: Hot Dense Coated: 880To Crushing Recharging Of Dolomie 0/56 Mm: 612To Start Of The Site: September 2025 Predictable Duration: 15 Working Days For The Site
Mission Of Engineer In Civil Engineering And Architect Relating To Realization: "Reconstruction Of The Oa682 Bearing The Cr132 On The Railways In Schrassig"
Recharge And Reprofing Of A Adjoining Rural Path (Out Of 1110 M ') To The Locals: "Beim Keizenbour-Im Kitzebour" In Christnach/Medernach On The Territory Of Waldbillig Municipalities And Ernz Valley Large: Hot Dense Coated: 880To Crushing Recharging Of Dolomie 0/56 Mm: 612To Start Of The Site: September 2025 Predictable Duration: 15 Working Days For The Site
Mission Of Engineer In Civil Engineering And Architect Relating To Realization: "Reconstruction Of The Oa682 Bearing The Cr132 On The Railways In Schrassig"
Notification Of Planned Sole Source Award. Repair Services For Boxer Driver .