Technical Installation Works In General Partial Business Include The Work Of Low -Voltage Electrical Installations, Low Current And Renita, Hvac And Sanitary Facilities Work, Work In Production In Production. The Duration Of The Work Is 381 Working Days, To Start Around 2025. The Work Is Sold At Unit Prices.
This Market Consists Of All The Work Allowing The Dismantling Of Existing Behaviors And Existing Pressure Regulation Equipment, As Well As The Reassembly Of New Stainless Steel Pipes And Regulation Equipment In The Technical Premises. An Upgrading Of Pressure Regulation Equipment In The Tunnel Galleries Is Also Part Of This Market. In Order Not To Disturb The Exploitation Of The Tunnel During These Works, A Provisional Water Pipe In The Technical Premises Will Be Installed In Order To Guarantee The Food For Extinction In The Tunnel At All Times.
This Market Concerns The Collection, Transport And Treatment/ Recycling Of Waste From The Members Of The Sycosal (Inter -Municipal Union For The Collection, Evacuation And Elimination Of Waste From The Municipalities: Bettembourg, Kayl, Mondecange, Roeser, Rumelange, Schifflange And Leudelange). The Market Is Divided Into 5 Separate Lots: Household Waste (Lot 1), Bio -Waste (Lot 2), Bulky Waste (Lot 3), Old Paper Waste (Lot 4) And Old Glass Waste (Lot 5). The Economic Operator Can Submit An Offer For A Single Batch, Several Lots Or For All Lots. Start Of The Contract: 01/01/2026 Contract Duration: 5 Years
Carrelages Work (Ve 3531) - House Of Elders Rumelange
Lofleglle Maison Relais "Sea Villager» And Junglënsm - Mentalist & Menuer - Meables Faugeses
Resin Works (Ve 3533) - House Of The Ains Rumelange
Floor Work In Resin Pu And Epoxy To Be Executed On Behalf Of Servior As Part Of The Project To Build The New House Of The Elders At L-3743 Rumelange. Large Of Work: - Epoxy Resin Floor Complex: Approx. 600 M² - Floor Complex In Polyurethane Resin (Pu): Approx. 400 M² - Plinthes And Associated Accessories
Various Mobile Furniture (+/- 1400 Pcs): Beds (Baby, Child, Adult), Cupboards, Offices, Chairs, Armchairs, Couches, Tables, Shelves, Lockers. The Duration Of Supplies Is 60 Working Days, (Including Taking Measures, Making Plans, Manufacturing And Installation), In Different Phases (Not Consecutive) To Start The 1St Quarter 2026. The Works Are Sold At Unit Prices.
5751 - Travaux'S Plâ Squasreie It Places, Enduits, Closuits It Foodz Qtz Q7, Erundry (7,3, 7.4) 7.4)
5751 - Travaux'S Plâ Squasreie It Places, Enduits, Closuits It Foodz Qtz Q7, Erundry (7,3, 7.4) 7.4)
The call for applications concerns participation in the dynamic acquisition system for the supply of non-food products through the national digital procurement platform “Supply4Future” in public collective catering establishments managed by RESTOPOLIS.
The call for applications concerns participation in the dynamic acquisition system for the supply of foodstuffs through the national digital procurement platform “Supply4Future” in public collective catering establishments managed by RESTOPOLIS.