Bt And Cf Electrical Installations Including: Provisional Site Installation, Lightning Protection, ~ 1,500 M Cable Paths, ~ 20 Distribution Tables, ~ 700 Luminaires, ~ 1,000 Installation Equipment (Sockets, Switches, .), ~ 400 Detectors (Fire Detection, Intrusion And Smuggling), Knx, ~ 20,000 M It Access, Parlophony, Telephony, Cameras, Multimedia Equipment, Safety Facilities For People And Objects. The Duration Of The Work Is 590 Working Days, To Be Started In The 1St Quarter Of 2026.
Electrical Installations - Installation Shared Update - Distribution Tables - Cable Paths - Switches (Knx) And Sockets - Lighting (Interior - Outside - Relief) - Fire Detection - Debuting - Intrusion - Installations Telephones - Computer Network - Call Nurses - Access Control - Renita Installations - Parlophone - Surveillance - Sounding - Video Projection - Video Projection - Video Projection -
The Object Of The Market Consists In The Provision Of Surveillance And Guarding Services For The Needs Of The Various Csee Entities For A Period Of One Year (2026), Entirely Or Partially Renewable.
- Equipotential Earth Setting - 700 M Of Path And Cable Scale - Counting Table - Low Voltage General Table (Tgbt) - 5 Divisional Tables (Td) - Photovoltaic Decoupling Protection - Low Voltage Wiring, Low Current - 150 Switches And Sockets (Apparent And Recessed) - Floor Box - Pmr Kit - Stores And Lighting Management - 350 Lighting (Inner - Rescue) - Full Fire Detection - Services - Alarm Tele -Transmitter - Fibs - Fsd - Access Control - Data Start Of Work: June 2026 Duration Of Work: 240 J.O.
- Aluminum Wall-Rideau Facade With And Without Fire-Cup Requirements, Approx. 2.510 M2 - Outdoor Carpentry In An Aluminum, With And Without Requirements Fire Cup, Sending . 400 M2 - Exterior Steel Carpentry, With And Without Fire Cup Requirements, 2 Pcs - Garage Doors, 3 Pcs - Partially Vegetated Flat Roof Extensive, Approx. 2,000 M2 - Vegetation, Approx. 326M2
Special Technical Macro-Lot: Hvac / Sanitary / Electricity / Fire Protection, For The New Administrative Building Of Cfls. // Application Phase See Appendix
Interior Wooden Carpentry Work And Metallic Fire Doors To Be Carried Out As Part Of The Construction Of A New Pétange House In Pétange
The Start Of Business Studies Is Scheduled For February 2026. The Start Of On -Site Work Is Scheduled For July 2026. The Overall Duration Of Work (Excluding Tests And Commissioning) Is 506 Working Days (In Phases). Large Of The Work: Electrical Installations With Low Current (Lot 15) - 530 Hp General And Evacuation Sound And Evacuation - Fire Detection For 850 Detectors And 1800 M Per Suction - Debuting 5 Staircase Cages And 2 Power Stations For Outlets - Management Of Swimming Pool And Cash Register Equipment - 9 Barriers And 7 Exterior Retractable Terminals - Renita Telecommunications Installation - 100 Posts And 2 Ip And Mobile Infrastructure 5G - 15 It Racks, 1000 M Fo And 11000 M Of Duplex Cable
Interior Wooden Carpentry Work And Metallic Fire Doors To Be Carried Out As Part Of The Construction Of A New Pétange House In Pétange
Annual Control And Fire Extinguisher
Terragement Works On The Territory Of The City Of Luxembourg In The Interest Of The Water Service Incumbent On The Following Shutters: 1) Civil Engineering Works In The Event Of Failures On The Water Network And Particular Branches 2) Civil Engineering Work In For The Replacement Of Dilapidated Connections 3) Works For The Compliance Of The Water Network (Replacement Of Valves, Fires, Etc.) 4) 4) 4) 4) 4) 4) 4) 4) 4) 4) 4) 4) 4) 5) Construction Of Looks For Drinking Fountains.
Safety Lighting: Central Battery, 92 Circuits Access Control: Interior And Exterior Doors Per Badges. Fire Detection: 450 Smoke Detectors. Lighting:> 1,600 Interior Lights, 45 Exterior Masts. Strong/Low Current:> 1,300 Catches, 300 Knx Buttons, 250 Knx Detectors. Tables: 1 Tgbt With 23 Sub-Rooms. The Duration Of The Work Is 415 Working Days, To Start The 3Rd Quarter Of 2026. The Work Is Sold At Unit Prices.
Operation And Support Services (O&Ss) For The Hellenic Fire Brigade (Hfb) .
Consolidated Purchase Of Various It Equipment And Components For Naew .
Laser Pointer And Illuminators, High Power
Supply, Delivery And Installation Of Fire Extinguishers In Kosovo