Helicopter Infrastructure Associated Works, Spain
Photovoltaic Installation Works To Be Carried Out In The Interest Of Reception Infrastructure For Children And Young People In Pétange - Building C.4 - Robert Krieps Site
Fontaine Pack Passangles In Center Culturena Bulture Yu To Luxembourg Wish 60, Avenunny Vaco Zugo Loga In Luxembourg
List_2024_30_Po_Gtc
Provision Of Accessories For L3Harris Radios
Middle Voltage Electrical Installations - Mt Post - Provisional Installation Site - Tables Distribution - Switters And Sockets - Lighting (Interior - Exterior - Rescue) - Computer Network
Purpose Of The Work: Development Of A Shared-Space In The Rue De L'Eglise And Rue Du Fossé Without Differences In Levels Between The Roadway And The Sidewalk With Renewal Of Various Networks. Succinte -Market Description - Civil Engineering Work Earthworks (Roads + Trenches): 7,600M3 Embankments (Roads + Trenches): 7,600M3 Dallage 30X60Cm: 2,750.00 M² Slabs: 520.00M Colorful Coated: 180 To Cornières For Bins Planted In Corten Steel: 320M Pipeline (Wastewater And Rainwater): 720M Water Driving Work: 520M Various Network Work Start/Duration Of Work: September 2025/400 Working Days
Technical Assistance With The Implementation Of The Noor Atlas Photovoltaic Project (Kingdom Of Morocco)
Special Techniques (Hvac/Sanitary/Electricity/Fire Protection/Smart Building) For The New Cfl Training Center. // Application Phase
The Start Of The Work Is Scheduled For 01.09.2025. The Duration Of The Work Is 160 Working Days (Work To Be Carried Out In Different Phases Divided Between 2025 And 2027 Non -Continuous And With Site Installation).
The Start Of The Work Is Scheduled For October 2025. The Duration Of The Work Is 131 Working Days (In Phases).
The Start Of Work Is Scheduled For 14.07.2025. The Duration Of The Work Is 60 Working Days (Work To Be Carried Out In Different Phases Distributed Between 2025 And 2027 Non -Continuous And With Repairing Site Installation).
Technical Installation Works "Hvac - Sanitarians - Sprinkge" To Be Executed In The Interest Of The Construction Of The Social Security City - Phase Ii, 2 Rue Mercier, L -2985 Luxembourg. This Call For Tenders Includes, Among Other Things, The Following Work:- Hvac Part: +/- 45 Radiators, +/- 115 Flooring Conveners In A Gutter, +/- 1.085 M2 Heating-Ground, Heating Distribution +/- 19.500 M, 2 Refrigeration Machines, 2 Cooling Laps, Cold Distribution +/- 19.500 M, +/- 1,200 Reversible Islets, 11 Exchange, 1 Co Ventilation For Parking, 1 Installation Drive In Case Of Smoke Extraction- Sanitary Part: Evacuations Of Wastewater And Rainfall +/- 4,500 M, Distribution Of Cold And Hot Water +/- 4.100 M, 1 Production Of Domestic Hot Water, +/- 270 Sanitary And Accessories Equipment, 1 Overpressure Installation For Ria- Sprinkler Part: 6 Control Stations, 1 Sprinkler Network (+/- 4.800 Heads And +/- 17.500 M Piping)
Deconstruction Of - 2 Single -Family Homes. - 13 Twin Residential Buildings. - 4 Buildings With Garages. Securing The Site By Metal Trellis Fences (500 M). Backstage In Demolition Materials (2000 M³). Sorting Materials. Careful Disassembly Of Elements For Recovery. The Duration Of The Work Is 125 Working Days, To Be Started During The 2ᵉ Semester 2025.
Photovoltaic Installation Of 738 Modules. Total Power: 332 Kwp Start Of Work: March 2, 2026 Duration Of The Work: 50 J.O.
Recharge And Reprofing Of A Adjoining Rural Path (Out Of 1110 M ') To The Locals: "Beim Keizenbour-Im Kitzebour" In Christnach/Medernach On The Territory Of Waldbillig Municipalities And Ernz Valley Large: Hot Dense Coated: 880To Crushing Recharging Of Dolomie 0/56 Mm: 612To Start Of The Site: September 2025 Predictable Duration: 15 Working Days For The Site
The Start Of The Work Is Scheduled For 06/30/2025 The Duration Of The Work Is 50 Working Days (Work To Be Carried Out In Different Stages Divided Between 2025 And 2027 Non -Continuous And With The Site Installation).
The Housing Fund Has Decided To Initiate A Call For Candidates, With A View To The Conclusion Of A Market, Based On Standard Contracts <Project Management>> Of The Housing Fund, For The Completion Of A Complete Project Management Mission For The Following Project: [Project 2040: Energy Renovation Of The Building Classified As A Communal Protected Sector, Reorganization Of The 4 Existing Apartments, Construction Of An Extension Including 2 Additional Accommodation And Development Of Access And Green Spaces.
Artistic Lighting
2487 - Signaling Work - "Wëltgebond" Lot 48 - Construction Of 42 Housing Units In Mamer