2544 - Construction Of 16 “Lehmkaul” Houses In Dorscheid - Plastering And Ceiling Works
5751 - Thermal Insulation Work And Coated At Cement - Wunne Mat Der Woltz In Wiltz - Quarter Q7 Nordhang 5 Buildings (7.1, 7.2, 7.3, 7.4 And 7.5)
2544 - Construction Of 16 “Lehmkaul” Houses In Dorscheid - Plastering And Ceiling Works
Wooden Fat Work / Insulation Work / Roofing Waterproofing / Windows And Garage Doors / Wooden Facades Work
5751 - Thermal Insulation Work And Coated At Cement - Wunne Mat Der Woltz In Wiltz - Quarter Q7 Nordhang 5 Buildings (7.1, 7.2, 7.3, 7.4 And 7.5)
Work For The Metal And Grid Ceilings In The Course Of The New Building Of The Central Building As Part Of The Large -Scale Project <> In Luxembourg Belair. The Order Includes The Following Work: The Ve 3420 Metal And Grid Ceilings Contains The Following Work In The Course Of The Construction Site For The Project "Nouveau Bâtiment Center (Nbc) Of The Center Hospitalier De Luxembourg (Chl): 16,000M2 Metal Panels Long Field Ceiling. 160M2 Metal Panels 600M2 Metal Ceilings 625 X 625 Mm 420M2 Metal Grid Ceilings Smooth 625 X 625 Mm Moisture Rooms 550M2 Plasterboard Parts Ceiling Fields Smooth Various Installation Parts And Wall Connections
Construction Of The New Resource Center In Kehlen - Lot 10 Metal Exterior Joinery
2544 - Construction Of 16 Houses "Lehmkaul" In Dorscheid - Blot And Tiles Work
5251 - Wood Interior Joinery Work - "Wunne Mat Der Wooltz" Q2 - Lot 7 - Multifunctional Building In Wiltz
Cre_2025_040 Replacement Of 3 Coba Supports
Work Volume: Earthworks: 19,000 M3, Coated: 14,300 Tb, Crushed: 14,000 M3, Borders: 4,350 M, Concrete: 1,800 M3
The Market Consists Of The Replacement Of Existing Supports N ° 20, N ° 23 And N ° 28 By The New Supports N ° 20A, N ° 23A And N ° 28A On The Respective Lines L5301-Bertrange-Bascharage, L5503-Schifflange-Bascharage And L5511-Aubange-Bascharage
5251 - Wood Interior Joinery Work - "Wunne Mat Der Wooltz" Q2 - Lot 7 - Multifunctional Building In Wiltz
5651- Interior Metal Doors Work, Interior And Exterior Locksmith, Painting - Wunne Mat Der Wooltz In Wiltz - Rehabilitation Of The Ideal Administrative Building
Construction Of The New Resource Center In Kehlen - Lot 13 Metal Interior Doors
2544 - Construction Of 16 Houses "Lehmkaul" In Dorscheid - Blot And Tiles Work
Large Of The Work: - Terns In Large Mass: 1,250 M3, - Sleeping Shielding Stretchers Diameter 90Cm: 1,475 M, - Reinforced Concrete: 1550 M3, - Reinforced Concrete Reinforcements: 460 Tb, - Reinforced Concrete Pipes Dn900: 30 M, Predictable Start Of Work: October 2025 Duration Of The Work: 300 Working Days
House Of Health In Useldange - Flat Roofing Work
- Earthmoving Work: 500 M3 - Stackage Work: 200 M3 - Murdling Demolition Work: 160 M3 - Wooden Floor Removal Work: 300 M2 - Waterproofing Work: 30 M2 - Thermal Insulation Work: 230 M2 - Reinforced Concrete Work: 130 M3 - Formwork Work: 400 M2 - Ferraillage Work: 21,000 Kg - Starting Work: 200 M2 Work: 08.09.2025 Duration Of The Work: 175 J.O.
2452 - Transformation Of The Old Useldange Convent - Moellons Masonry Work (Peripheral Wall)