Waterproofing Work - Flat Roofing
2477 - Locksmith And Ironwork Work - New Construction Of 28 Single -Family Houses - Band And Twin, Gehaansraich Houses In Gonderange
5751 - Thermal Insulation Work And Coated At Cement - Wunne Mat Der Woltz In Wiltz - Quarter Q7 Nordhang 5 Buildings (7.1, 7.2, 7.3, 7.4 And 7.5)
The Objective Of This European Research Project Is To Develop Actionable Insights And Strategies For Aligning Territorial Development With The Planetary Boundaries Framework. By Integrating Nature Based Solutions, Circular Economy Models And Innovative Governance Mechanisms, The Project Seeks To Help Enable Regions And Territories Across Europe To Adapt To And Mitigate Climate Change While Preserving Ecological Integrity And Societal Wellbeing.
Supply And Installation Of A Temporary Structure For The Temporary Accommodation Of A Medical Office To Be Executed In The Interest Of Ona - Home For Dpi In Bollendorf -Pont - Deconstruction Of The André And New Construction Hotel
Provision Of Ois Microsoft Infrastructures / Public Cloud Co
Elevators For The New Cfl // Application Phase Training Center
2544 - Construction Of 16 Houses "Lehmkaul" In Dorscheid - Blot And Tiles Work
The Market Consists Of The Replacement Of Existing Supports N ° 20, N ° 23 And N ° 28 By The New Supports N ° 20A, N ° 23A And N ° 28A On The Respective Lines L5301-Bertrange-Bascharage, L5503-Schifflange-Bascharage And L5511-Aubange-Bascharage
Delivery And Assembly Of The Furniture Of New School Buildings On The "Um Ewent" Campus In Contern
2544 - Construction Of 16 Houses "Lehmkaul" In Dorscheid - Blot And Tiles Work
Construction Of The New Resource Center In Kehlen - Lot 14 Coated Work
House Of Health In Useldange - Flat Roofing Work
- Earthmoving Work: 500 M3 - Stackage Work: 200 M3 - Murdling Demolition Work: 160 M3 - Wooden Floor Removal Work: 300 M2 - Waterproofing Work: 30 M2 - Thermal Insulation Work: 230 M2 - Reinforced Concrete Work: 130 M3 - Formwork Work: 400 M2 - Ferraillage Work: 21,000 Kg - Starting Work: 200 M2 Work: 08.09.2025 Duration Of The Work: 175 J.O.
Technical Installation Works "Hvac - Sanitarians - Sprinkge" To Be Executed In The Interest Of The Construction Of The Social Security City - Phase Ii, 2 Rue Mercier, L -2985 Luxembourg. This Call For Tenders Includes, Among Other Things, The Following Work:- Hvac Part: +/- 45 Radiators, +/- 115 Flooring Conveners In A Gutter, +/- 1.085 M2 Heating-Ground, Heating Distribution +/- 19.500 M, 2 Refrigeration Machines, 2 Cooling Laps, Cold Distribution +/- 19.500 M, +/- 1,200 Reversible Islets, 11 Exchange, 1 Co Ventilation For Parking, 1 Installation Drive In Case Of Smoke Extraction- Sanitary Part: Evacuations Of Wastewater And Rainfall +/- 4,500 M, Distribution Of Cold And Hot Water +/- 4.100 M, 1 Production Of Domestic Hot Water, +/- 270 Sanitary And Accessories Equipment, 1 Overpressure Installation For Ria- Sprinkler Part: 6 Control Stations, 1 Sprinkler Network (+/- 4.800 Heads And +/- 17.500 M Piping)
Deconstruction Of - 2 Single -Family Homes. - 13 Twin Residential Buildings. - 4 Buildings With Garages. Securing The Site By Metal Trellis Fences (500 M). Backstage In Demolition Materials (2000 M³). Sorting Materials. Careful Disassembly Of Elements For Recovery. The Duration Of The Work Is 125 Working Days, To Be Started During The 2ᵉ Semester 2025.
2452 - Transformation Of The Old Useldange Convent - Moellons Masonry Work (Peripheral Wall)
Photovoltaic Installation Of 738 Modules. Total Power: 332 Kwp Start Of Work: March 2, 2026 Duration Of The Work: 50 J.O.
Lot 7 - Dry And Coating Partition Work
The Start Of The Work Is Scheduled For 06/30/2025 The Duration Of The Work Is 50 Working Days (Work To Be Carried Out In Different Stages Divided Between 2025 And 2027 Non -Continuous And With The Site Installation).