Renewal Of The Fire Alarm System In The Area Of The Fermentation System
Rehabilitation "Conterstuff" In Contern - Waterproofing And Insulation Work On Flat Roofs
Kayl - Transformation The L'Ecole Way
Metal Framework
Call Renewal Of The Fire Alarm System In The Area Of The Fermentation System. The Start Of Execution Is Scheduled For October 2025. The Execution Period Is 212 Working Days.
Submission Relating To Construction Works In General Business Of A Hall With Equipment For Research In The Field Of Space Sciences In The Interest Of The Construction Of Space Campus - Phase 1: Halle Esric (European Space Resources Innovation Center) In Esch - Belval.
Construction Of A Modular Building At The School Site In Clemency
Ventilated Scaffolding And Facade
5252 - External Developments Work - Production Of The Ditches For Evacuation Of Rainwater To The Project Retention Basins 5252 "Wunne Mat Der Wooltz" In Wiltz Quarter Q2
Construction Of A Children'S Complex In Sanem: Electricity Work
2571-Chappes And Tile Work-Construction Of 2 Residences At 6 Units, 1 And 3 Ops From Quärten To L-3961 Ehlange-Sur-Mess
Standing Work Mainly In Prefabricated Concrete Elements, With Isolated Facade In Perforated Sheet Metal, Flat Roof With Photovoltaic Part And Green Part. Elevator, Technical Installations, Scientific Equipment, Furniture And Outdoor Storage Space.
The Execution Of The Closed Coarse Work Of Two Residential Buildings In Luxembourg.
5252 - External Developments Work - Production Of The Ditches For Evacuation Of Rainwater To The Project Retention Basins 5252 "Wunne Mat Der Wooltz" In Wiltz Quarter Q2
Electricity Work As Part Of The Construction Of A Children'S Complex In Sanem: - 6 Electric Tables - 1 Election Electional Tables - 6 Computer Rack - 21,300M High Voltage Cables - 16.700M Low Voltage Cables - 21.800M Cable Path - 1100M Metal Cable Paths - 1440 Electric Devices And Knx Components - 520 Lights - 1 Battery Center With 210 Components Fire With 600 Components - 1 Intrusion Power Plant With 120 Components - 1 Protection System Against Lightning Foreseeable Start Of Work: February 2026 Predictable Duration Of Work: 280 Working Days
2239 - Construction Of 9 Dwellings (4 Houses With Integrated Accommodation And 1 Single -Family House) - Demolition Work
Elevator Installation Work-Brouch School In Esch-Sur-Alzette
Building Maintenance Contract Of The Premises Of The European Union In Athens, Greece: Lot 1: Maintenance Contract For Technical Installations And Building Elements Lot 2: Maintenance Contract For Security Equipment
Extension Of Lycee Michel Lucius In Luxembourg - Modular Annex -Secondary School
Extension Of The Lycee Michel Lucius In Luxembourg - Modular Annex -Primary School