Technical Installation Works In General Partial Business Include The Work Of Low -Voltage Electrical Installations, Low Current And Renita, Hvac And Sanitary Facilities Work, Work In Production In Production. The Duration Of The Work Is 381 Working Days, To Start Around 2025. The Work Is Sold At Unit Prices.
Supply Parts For Pzh2000 Distribution Box, Sling Engine An
Deconstruction Work To Be Carried Out In The Interest Of The Airport City Project In Findel - Demolition
Supply Of An Lifting Nacelle Mounted On A Van
Supply Of Spare Parts For Awacs Fleet
Supply Of An Electric Road Sweeper Of An Authorized Maximum Mass Of 3.5 Tonnes For The Needs Of The Technque Communal Service.
Submission Relating To Construction Works In General Business Of A Hall With Equipment For Research In The Field Of Space Sciences In The Interest Of The Construction Of Space Campus - Phase 1: Halle Esric (European Space Resources Innovation Center) In Esch - Belval.
Exterior Carpentry
Middle Voltage Electrical Work To Be Carried Out In The Interest Of The Lycée Des Arts Et Métiers In Luxembourg - Energy Assaint
External Carpentry House B Of The Brouch School In Esch/Alzette
Supply Of A Vehicle For The Maintenance Of Green Spaces
Heating, Ventilation And Sanitary Work To Be Carried Out In The Interest Of The Rehabilitation Of "Conterstuff" In Contern. - 1 Heat Pump (45 Kw), 1 Gas Boiler (99 Kw) - 450 M² Floor Heating, 52 Radiators - 1750 M Heating Pipes - 1 Cta 10000 M³/H, 1 Cta 1000 M³/H, 2 Vmc And 2 Extractors. - 800 M² Ventilation Ducts - 30 Sanitary Equipment - 1100M Of Ef Pipes, Ec - + All Accessories. Start Of Work: 01/10/2025 Duration Of Work: 200 Working Days (In Several Phases)
The Sicona-Center, As A Contracting Authority, Proposes To Acquire By Way Of Public Submission A New Vehicle Whose Technical Characteristics As Well As The Equipment Is Included In The Special Specifications Below.
Carrelages Work (Ve 3531) - House Of Elders Rumelange
Supply Of Spare Parts For The Support Of Pzh2000
Creation Of School Transport Within The Municipality Of Leudelange. Service Scale: School Transport With Two Buses According To The Schedules Presented By The School Service For A Contract Period Set At 1 Year.
Buried Networks Work To Servic The Site And Transformer To Be Carried Out In The Interest Of The Administration Of Nature And The Forests In Dudelange
The City Of Esch-Sur-Alzette Wishes To Requalify The Developments Of Rue Winston Churchill. As Part Of This Submission, It Is Planned To Deposit The Existing Road Trunk And Carry Out A New Leveling In Order To Create A Shared Space, Commonly Called "Shared Space", In Front Of The Woblécken School. This Requalification Work Will Be Carried Out In Two Phases, The First Of Which Is The Subject Of This Submission. Low -Scale Interventions On The Pipes Are Also Planned, Such As The Replacement Of Siphons And Linear Gutters, Made Necessary By The Change In Leveling. The Work Also Includes Requalification Or Partial Strengthening Of The Following Dealers' Networks: • Sudstroum; • The Collective Antenna; • Public Lighting (Partially); • Water Pipe, The Installation Of Which Will Be Provided By The Municipality. Beginning / Duration Of Work: October 2025/150 Working Days
Surveillance And Guarding To Be Carried Out In The Interest Of The Project "Old National Library - Renovation And Transformation"
Roadworthiness Inspections For Nato Fleet Of Vehicles And Tr