Technical Installation Works In General Partial Business Include The Work Of Low -Voltage Electrical Installations, Low Current And Renita, Hvac And Sanitary Facilities Work, Work In Production In Production. The Duration Of The Work Is 381 Working Days, To Start Around 2025. The Work Is Sold At Unit Prices.
Construction Of A Kitchen And School Canteen "Op Der Heckt" Site In Dahl - Painting Work
Supply Of A Vehicle For The Maintenance Of Green Spaces
Heating, Ventilation And Sanitary Work To Be Carried Out In The Interest Of The Rehabilitation Of "Conterstuff" In Contern. - 1 Heat Pump (45 Kw), 1 Gas Boiler (99 Kw) - 450 M² Floor Heating, 52 Radiators - 1750 M Heating Pipes - 1 Cta 10000 M³/H, 1 Cta 1000 M³/H, 2 Vmc And 2 Extractors. - 800 M² Ventilation Ducts - 30 Sanitary Equipment - 1100M Of Ef Pipes, Ec - + All Accessories. Start Of Work: 01/10/2025 Duration Of Work: 200 Working Days (In Several Phases)
The Sicona-Center, As A Contracting Authority, Proposes To Acquire By Way Of Public Submission A New Vehicle Whose Technical Characteristics As Well As The Equipment Is Included In The Special Specifications Below.
Heating, Ventilation And Health Facilities As Part Of The Construction Of A Children'S Complex In Sanem: - 1 Ice Accumulator - 2 Heat Pumps - 1 Heat Pumps For Dhw Production - 2 Cta - +/- 4000M Of Pipes - +/- 3100M² Of Ventilation Sheath - +/- 3600M² Of Soil Heating - 1 Regulation Table Predictable Work: February 2026 Duration: February 2026 Previgious Work: 280 Working Days
Building Maintenance Contract Of The Premises Of The European Union In Athens, Greece: Lot 1: Maintenance Contract For Technical Installations And Building Elements Lot 2: Maintenance Contract For Security Equipment
The City Of Esch-Sur-Alzette Wishes To Requalify The Developments Of Rue Winston Churchill. As Part Of This Submission, It Is Planned To Deposit The Existing Road Trunk And Carry Out A New Leveling In Order To Create A Shared Space, Commonly Called "Shared Space", In Front Of The Woblécken School. This Requalification Work Will Be Carried Out In Two Phases, The First Of Which Is The Subject Of This Submission. Low -Scale Interventions On The Pipes Are Also Planned, Such As The Replacement Of Siphons And Linear Gutters, Made Necessary By The Change In Leveling. The Work Also Includes Requalification Or Partial Strengthening Of The Following Dealers' Networks: • Sudstroum; • The Collective Antenna; • Public Lighting (Partially); • Water Pipe, The Installation Of Which Will Be Provided By The Municipality. Beginning / Duration Of Work: October 2025/150 Working Days
Cvpl - Extension And Equipment Of Protected Workshops "Café Promenschenkel" In Prettingen
Hedeknippchen Workshops - Lot 12 Hot Works
Various Mobile Furniture (+/- 1400 Pcs): Beds (Baby, Child, Adult), Cupboards, Offices, Chairs, Armchairs, Couches, Tables, Shelves, Lockers. The Duration Of Supplies Is 60 Working Days, (Including Taking Measures, Making Plans, Manufacturing And Installation), In Different Phases (Not Consecutive) To Start The 1St Quarter 2026. The Works Are Sold At Unit Prices.
Hedeknipphen Workshops - Lot 11 Work Of Dry Works, False -Stalements And Coatings
The Offer Must Include The Delivery Of All The Equipment Described In The 3 Lots Of The Specifications, Included Installation And Commissioning, Ready To Be Used. (1) Fixed And Mobile Equipment (Interior); (2) Multimedia Equipment; (3) Kichenette The Equipment Provides Must Be Certified As "Ce". Only Sanitary Equipment (Sinks, Wcs, Taps) Are Not Part Of The Notebooks Of The Notebook.
Lot 7 - Production Kitchen
The Project Includes: - The Redevelopment Of The Pavement Trunk And Improving Adhesion; - Enlargement And Strengthening Of Shoulders; - The Implementation Of Reservoir Devices; - The Elimination Of Low Walls On The Edge Of The Dangerous Road; - The Distance From The Canettes Of The Road According To The Availability
Enlargement Of The A3 Motorway To The Law Of The Livange Interchange With The Construction Of Four New Straps For The Livange Interchange As Well As The Demolition And Reconstruction Of The Work Oa1020. The Work Consists In Particular In The Realization Of: - Enlargement Of The A3 Motorway With The Construction Of The New Livange Interchange Composed Of Four New Suspenders - Demolition And Reconstruction Of The Work Oa1020 In Phases - Construction Of Provisional Abutments For The Establishment Of A Provisional Work During The Reconstruction Of The New Work Oa1020 - Rehabilitation Of The Work Oa1021 - Deviation Or Protection Of Existing Networks And New Networks - Construction Of An Open Retention Basin - Renewal Of The Bond Layer And The Rolling Layer On The Entire A3 Motorway Within The Limits Of The Project And On A Part Of The Project Limits - Recovery Of The N31 And Agricultural Paths - Construction Of Acoustic Screens - Installation Of Signal Lights On The N31 Crossroads Of The New Executive Executive Exchange: Prepictable Work: Fall 2025
Functional And Technical Support, Development And Corrective, Adaptive And Evolving Work And Maintenance Work On The National Applications Of The Schengen Information System, Applications Related To Border Controls At The Airport, National Applications Of The Entry And Exit System And The Cesma Application For The Needs Of The International Relations Directorate Of The Grand-Ducal Police
The Subject Of The Order To Be Awarded Is The Planning And Direct Execution Of A Residential Construction Project In The Municipality Of Mertzig, Consisting Of A Total Of 7 Houses, With A House Consisting Of 2 Rental Apartments. The Contractor Has To Provide All Planning And Execution Services That Are Necessary To Establish The Construction Work.
Chl Nbc Ve 3140 Farming
The Subject Of The Order To Be Awarded Is The Planning And Direct Execution Of A Residential Construction Project In The Municipality Of Mertzig, Consisting Of A Total Of 7 Houses, With A House Consisting Of 2 Rental Apartments. The Contractor Has To Provide All Planning And Execution Services That Are Necessary To Establish The Construction Work.