Expansion Of The Traffic System "Im Dellmich" In The Bad Neuenahr District
S28-25/Cleaning Environment And Ornament/Automotive Park Cleaning/Desabollasto Service, Painting, Cleaning And Change Of Parts For A-362 Toyota Hilux Truck Year 2018.
Adp/N.Ganj/Ari/2023-24/123 1). Construction Of Road From Panchruki Bhuyanpara Mosque To Milon Mia'S Bari At Satgram Up Underaraihazar Upazila Dist Narayangonj. 2). Construction Of Road From Ponir Membar Bari To Swapan Doctor Bari At Satg.
Rehabilitation Of Faridgonj Bazar Road From Ar High School Gate Two Kalir Bazar Chowrasta Through Keroa Bridge & Thana Moar, By Bc, Ch0+000-860M, At Ward No-08, Under Faridgonj Pourashava, Dist-Chandpur.
Installation Of Iron Removal Unit With Frp Double Vessel (Iron Media) At Different Installed Water Source With Submersible Pump Within Brahmanbaria District Under Project For Safe Water Supply Throughout The Country (Pswsc) Of Dphe Fy 2024-25.
Installation Of Iron Removal Unit With Frp Double Vessel (Iron Media) At Different Installed Water Source With Submersible Pump Within Brahmanbaria District Under Project For Safe Water Supply Throughout The Country (Pswsc) Of Dphe Fy 2024-25.
Installation Of Iron Removal Unit With Frp Double Vessel (Iron Media) At Different Installed Water Source With Submersible Pump Within Brahmanbaria District Under Project For Safe Water Supply Throughout The Country (Pswsc) Of Dphe Fy 2024-25.
Installation Of Iron Removal Unit With Frp Double Vessel (Iron Media) At Different Installed Water Source With Submersible Pump Within Brahmanbaria District Under Project For Safe Water Supply Throughout The Country (Pswsc) Of Dphe Fy 2024-25.
Installation Of Iron Removal Unit With Frp Double Vessel (Iron Media) At Different Installed Water Source With Submersible Pump Within Brahmanbaria District Under Project For Safe Water Supply Throughout The Country (Pswsc) Of Dphe Fy 2024-25.
Installation Of Iron Removal Unit With Frp Double Vessel (Iron Media) At Different Installed Water Source With Submersible Pump Within Brahmanbaria District Under Project For Safe Water Supply Throughout The Country (Pswsc) Of Dphe Fy 2024-25.
Installation Of Iron Removal Unit With Frp Double Vessel (Iron Media) At Different Installed Water Source With Submersible Pump Within Brahmanbaria District Under Project For Safe Water Supply Throughout The Country (Pswsc) Of Dphe Fy 2024-25.
Installation Of Iron Removal Unit With Frp Double Vessel (Iron Media) At Different Installed Water Source With Submersible Pump Within Brahmanbaria District Under Project For Safe Water Supply Throughout The Country (Pswsc) Of Dphe Fy 2024-25.
Installation Of Iron Removal Unit With Frp Double Vessel (Iron Media) At Different Installed Water Source With Submersible Pump Within Brahmanbaria District Under Project For Safe Water Supply Throughout The Country (Pswsc) Of Dphe Fy 2024-25.
Installation Of Iron Removal Unit With Frp Double Vessel (Iron Media) At Different Installed Water Source With Submersible Pump Within Brahmanbaria District Under Project For Safe Water Supply Throughout The Country (Pswsc) Of Dphe Fy 2024-25.
Design, Supply, Installation, Testing And Commissioning Of 03 (Three) Nos Passenger Lifts In Residential Quarter (West) At Payra 1320Mw Thermal Power Plant
Construction Of A Decentralized Sewage Treatment System For The Shahr-E-Naw Building Required By The Esteemed Directorate Of Services
Appointment Of Service Provider To Provide Support For Planning, Evaluation, Monitoring And Reporting Organisational Performance Management Services For The Nnr
Boka District Provisional Water Supply To The Operating Ditch Channel In The Region To Throw Water From The Pilos Ditches In The Region Through The Pump Station (Driver)
Construction Services For Residential Bathroom Renovation
59--Converter,Synchro, In Repair/Modification Of